Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials
- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials
- Date: Fri, 16 Oct 2020 03:02:24 +0000
Dear all,
I have made some slides for the ESRC review next Monday (Slides on inner
signal cable/T-board and summary are not finished). Your comments are
welcome.
https://drupal.star.bnl.gov/STAR/event/2020/08/24/star-forward-silicon-tracker-meeting/safety-pre-approval-materials
Best,
Zhenyu
PS. Slides for IST safety review can also be found in the above webpage
> On Oct 9, 2020, at 12:31 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Hi All,
> We are asked by CAD to do a safety review for FST on Monday Oct 19 2pm.
> Meeting info will be sent later.
> Zhenyu
>
>> Begin forwarded message:
>>
>> From: pak <pak AT rcf.rhic.bnl.gov>
>> Subject: Re: Pre-approval for STAR Forward Silicon Tracker materials
>> Date: October 8, 2020 at 6:17:50 PM CDT
>> To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
>> Cc: flemming videbaek <videbaek AT bnl.gov>, Robert Pak <pak AT bnl.gov>, Yi
>> Yang <yiyang AT ncku.edu.tw>
>>
>>
>> Hello Zhenyu,
>>
>> I forwarded your e-mail from Sept. 3rd to the ESRC Chair (attached below).
>> They asked for guidance from a materials specialist at CAD. That person
>> did not respond all this time, because they had surgery, and are on
>> medical leave. The ESRC Chair asked their stand-in for guidance, who
>> suggested to have a review of the Si tracker.
>>
>> The slides should include an overview of the detector, with emphasis on
>> the hazards to personnel and hazards to equipment. In my experience with
>> Si detectors, the first category is minimal. The second category has
>> greater risks involved, because Si detector are relatively fragile and can
>> be potentially damaged if proper precautions are not taken. Of course you
>> and Flemming are well aware of this from experience with the HFT. That is
>> why I am confident you will be able to handle this review. Attached is an
>> example from a similar review today.
>>
>>
>> On 2020-10-08 17:56, Ye, Zhenyu wrote:
>>> Hi Robert,
>>> We asked for pre-approval of materials, not a full safety review. What
>>> info should be included in the slides that the CAD would like to see?
>>> Do you have examples that can share with us.
>>> Thanks,
>>> Zhenyu
>>>> On 2020-10-08 17:27, pak wrote:
>>>>> Hello Zhenyu,
>>>>> The CAD representative standing in for the materials expert decided
>>>>> they would like a review of the Si tracker. That is a tentative time,
>>>>> because it does not work for me. Does it work for you?
>>>>> Also, would you be available to give the presentation on Monday
>>>>> instead? It is a Lab Holiday, but that works for me.
>>>>> Robert Pak
>>>>>>> On Oct 7, 2020, at 9:00 AM, pak <pak AT rcf.rhic.bnl.gov> wrote:
>>>>>>> Hello Zhenyu,
>>>>>>> The ESRC Chair was OK, but he reached out to someone else at CAD. I
>>>>>>> pinged them both again for any final questions/comments.
>>>>>>> Robert Pak
>>>>>>> On 2020-10-07 09:45, Ye, Zhenyu wrote:
>>>>>>>> Hi Robert,
>>>>>>>> Is there any feedback from Chair of the Experimental Safety Review
>>>>>>>> Committee at CAD?
>>>>>>>> Thanks,
>>>>>>>> Zhenyu
>>>>>>>>> On Sep 4, 2020, at 6:29 AM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>>>>>>>> Robert, Thanks a lot for the help. Yes, indeed. We don’t think
>>>>>>>>> there is no issue with most of the materials we use for the Silicon
>>>>>>>>> Tracker, as they are commonly used in other Silicon detectors, but
>>>>>>>>> feel it would be better to run it across the safety before the
>>>>>>>>> production starts.
>>>>>>>>> Best,
>>>>>>>>> Zhenyu
>>>>>>>>>> On Sep 4, 2020, at 5:42 AM, pak <pak AT rcf.rhic.bnl.gov> wrote:
>>>>>>>>>> OK Zhenyu, I will forward this e-mail to the Chair of the
>>>>>>>>>> Experimental Safety Review Committee at CAD. I really don't see
>>>>>>>>>> any issue. That's one of the benefits of a Si detector,
>>>>>>>>>> relatively low safety hazard (spoken by someone who spent 9 years
>>>>>>>>>> in Phobos and was recruited to build Si detectors in PHENIX).
>>>>>>>>>> Robert Pak
>>>>>>>>>> On 2020-09-03 18:58, Ye, Zhenyu wrote:
>>>>>>>>>>> Hi Rboert,
>>>>>>>>>>> Yes, we are aware of the compatibility requirement of the cooling
>>>>>>>>>>> tubes and NOVEC, and have selected two candidate tubes made of
>>>>>>>>>>> plastic
>>>>>>>>>>> based on vendor’s recommendation.
>>>>>>>>>>> The materials that we will use to build FST detector modules,
>>>>>>>>>>> cooling
>>>>>>>>>>> tubes and cables, include
>>>>>>>>>>> 1. Mechanical structure made of pure PEEK (not carbon fibre. See
>>>>>>>>>>> page
>>>>>>>>>>> 3 of Ref [1])
>>>>>>>>>>> 2. Cooling tubes embedded in each module made of Stainless steel
>>>>>>>>>>> coated with Chroming (see page 3 of Ref [1])
>>>>>>>>>>> 3. Cooing tubes connecting adjacent modules made of plastic (see
>>>>>>>>>>> page
>>>>>>>>>>> 27 of Ref [1])
>>>>>>>>>>> 4. Flexible PCB, made of Polyimide (see Ref [2])
>>>>>>>>>>> 5. Glue and Thermal Grease used for Mechanical structure and
>>>>>>>>>>> flexible
>>>>>>>>>>> PCB assembly (see page 3 of Ref [1])
>>>>>>>>>>> 6. Electronic board, made of FR-4 (see Ref [3])
>>>>>>>>>>> 7. Inner signal cable, the ones that Mike gave to you for
>>>>>>>>>>> Flammable test
>>>>>>>>>>> 8. Glue used for mounting Silicon sensors and frontend readout
>>>>>>>>>>> chips,
>>>>>>>>>>> but they are the same as we used for STAR Intermediate Silicon
>>>>>>>>>>> Tracker
>>>>>>>>>>> (2014-2016). I suppose they are fine.
>>>>>>>>>>> [1]
>>>>>>>>>>> https://indico.bnl.gov/event/9021/contributions/39989/attachments/29767/46442/20200803_FST_Mechanical_YiYang_v4.pdf
>>>>>>>>>>> [2]
>>>>>>>>>>> https://drupal.star.bnl.gov/STAR/system/files/Datasheet%20for%20hybrid%20v3_0.pdf
>>>>>>>>>>> [3]
>>>>>>>>>>> https://drupal.star.bnl.gov/STAR/system/files/Datasheet%20for%20T-Board%20v3_1_0.pdf
>>>>>>>>>>> We are wondering what kind of info is needed for pre-approval
>>>>>>>>>>> before
>>>>>>>>>>> we start the production.
>>>>>>>>>>> Thanks,
>>>>>>>>>>> Zhenyu
>>>>>>>>>>>> On Sep 3, 2020, at 4:36 PM, pak <pak AT rcf.rhic.bnl.gov> wrote:
>>>>>>>>>>>> Hello Zhenyu,
>>>>>>>>>>>> I am aware of the flame test for FST cable. What other
>>>>>>>>>>>> materials are specifically in question? The detectors
>>>>>>>>>>>> themselves and carbon fiber support structure are benign.
>>>>>>>>>>>> Electronics boards are made of FR-4, which is a fire resistant
>>>>>>>>>>>> version of G10. NOVEC cooling fluid is standard stuff now.
>>>>>>>>>>>> What you should be concerned about is the compatibility of your
>>>>>>>>>>>> cooling tubes and NOVEC cooling fluid, or leaks may develop over
>>>>>>>>>>>> time. Also there is triboelectric charging (electrostatic build
>>>>>>>>>>>> up) from the flowing NOVEC that may introduce leaks, but these
>>>>>>>>>>>> are not safety issues.
>>>>>>>>>>>> Robert Pak
>>>>>>>>>>>> On 2020-09-03 13:11, Ye, Zhenyu wrote:
>>>>>>>>>>>>> Dear Robert,
>>>>>>>>>>>>> This is Zhenyu from Univ of Illinois at Chicago. I hope you are
>>>>>>>>>>>>> doing well.
>>>>>>>>>>>>> I am the STAR FST upgrade project manager. As you may know,
>>>>>>>>>>>>> FST went
>>>>>>>>>>>>> through a production readiness review recently and we are about
>>>>>>>>>>>>> to
>>>>>>>>>>>>> start the detector module, electronic board/cable production.
>>>>>>>>>>>>> For this
>>>>>>>>>>>>> we would like to get a pre-approval (not sure if this is the
>>>>>>>>>>>>> right
>>>>>>>>>>>>> name) for the materials we are going to use.
>>>>>>>>>>>>> I am wondering if you can tell me what kind of info we should
>>>>>>>>>>>>> prepare
>>>>>>>>>>>>> for such a pre-approval review?
>>>>>>>>>>>>> Thanks,
>>>>>>>>>>>>> Zhenyu
>>>> --
>>>> Flemming Videbaek
>>>> senior scientist
>>>> videbaek @ bnl.gov
>>>> Brookhaven National Lab
>>>> Physics Department
>>>> Bldg 510D
>>>> Upton, NY 11973
>>>> phone: 631-344-4106
>>>> cell : 631-681-1596
>
> <Diamond Detector ASSRC Review
> 10-8-20.pdf>_______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Fwd: Pre-approval for STAR Forward Silicon Tracker materials,
Ye, Zhenyu, 10/09/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Ye, Zhenyu, 10/15/2020
- Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials, Maowu Nie, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
videbaek, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Aschenauer Elke-Caroline, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Zhenyu Ye, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Aschenauer Elke-Caroline, 10/17/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
videbaek, 10/18/2020
- Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials, Yi Yang, 10/18/2020
- Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials, Aschenauer Elke-Caroline, 10/19/2020
- Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials, Zhenyu Ye, 10/19/2020
- Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials, Gerard Visser, 10/19/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
videbaek, 10/18/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Aschenauer Elke-Caroline, 10/17/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Zhenyu Ye, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Aschenauer Elke-Caroline, 10/16/2020
-
Re: [Star-fst-l] Pre-approval for STAR Forward Silicon Tracker materials,
Ye, Zhenyu, 10/15/2020
Archive powered by MHonArc 2.6.24.