Skip to Content.
Sympa Menu

star-tpc-l - Re: [[Star-tpc-l] ] new RDO in STAR iTPC geometry

star-tpc-l AT lists.bnl.gov

Subject: Star-tpc-l mailing list

List archive

Chronological Thread  
  • From: "Fisyak, Yuri V" <fisyak AT bnl.gov>
  • To: James H Thomas <jhthomas AT berkeley.edu>, "Videbaek, Flemming" <videbaek AT bnl.gov>, "Camarda, Timothy" <tcamarda AT bnl.gov>
  • Cc: Tonko Ljubicic <tonko.ljubicic AT gmail.com>, Star-tpc L <Star-tpc-l AT lists.bnl.gov>
  • Subject: Re: [[Star-tpc-l] ] new RDO in STAR iTPC geometry
  • Date: Tue, 4 Mar 2025 19:58:56 +0000

Dear Jason and Jim, thank you for the drawings.

 

One question: Can I assume that holes marked on the left side of the fist drawing (TPC350-E-1) as  “2X”are set screw to support RDO ?


                                                              Yuri Fisyak

STAR                                           Phone: +1 631 344 3913
Brookhaven National Laboratory  Fax:    +1 631 344 4206
510A/1-161
http://www.star.bnl.gov/~fisyak       E-mail: fisyak AT bnl.gov

 

 

 

From: star-tpc-l-request AT lists.bnl.gov <star-tpc-l-request AT lists.bnl.gov> on behalf of James H Thomas <star-tpc-l AT lists.bnl.gov>
Date: Tuesday, March 4, 2025 at 1:38
PM
To: Videbaek, Flemming <videbaek AT bnl.gov>, Camarda, Timothy <tcamarda AT bnl.gov>
Cc: Tonko Ljubicic <tonko.ljubicic AT gmail.com>, Star-tpc L <Star-tpc-l AT lists.bnl.gov>
Subject: Re: [[Star-tpc-l] ] new RDO in STAR iTPC geometry

Dear TPC Experts,

 

Enclosed is an up to date diagram for the iTPC sectors.   The comment box in the upper right hand corner indicates that the drawing includes modifications for the Grid Leak Walls, and slots for the electronics shifted to their new positions.

 

P.S. Many thanks to Jason Farrell for creating this drawing for us.  He did an outstanding job on a very fast timescale.

 

Cheers,
Jim

--

Jim Thomas

Phone:  USA  (510) 759-4936

 

Please don't feel obligated to respond to this message outside of your normal working hours.

 

 

On Mon, Mar 3, 2025 at 10:06PM videbaek <videbaek AT bnl.gov> wrote:

Hi Yuri,

We should include Jim and Tim in these discussion. Tim has RDO boards in
the lab and we can check weights and sizes, and the teststand can
probably be used to see how the RDOs are positioned.
THE FFE are not exactly at the same position as the OLD but shifted by a
small amount (includes the holes for the FFEEs)

best Flemming


On 2025-03-03 09:51, Fisyak, Yuri V wrote:
> Hello Tonko, during yesterday ETOF meeting, it was a question about
> the material budget before ETOF.
>
> I have found that we have old description of geometry in GEANT for the
> electronics readout , done in 2005 mainly for ECAL.
>
> This description has not been updated with iTPC.
>
> The question is : Do you have any drawings for the iTPC electronics
> assembly ?
>
> I believe  the main difference is adding 2 more RDOs.
>
> For ETOF it is necessary to update this geometry.
>
>                                                               Yuri
> Fisyak
>
> STAR                                           Phone: +1 631 344 3913
> Brookhaven National Laboratory  Fax:    +1 631 344 4206
> 510A/1-161
> http://www.star.bnl.gov/~fisyak       E-mail: fisyak AT bnl.gov

--
Flemming Videbaek
senior scientist, emeritus
videbaek @ bnl.gov