  • From: "Zhang, Jinlong" <zhangjl AT anl.gov>
  • To: Elliot Lipeles <lipeles AT hep.upenn.edu>
  • Cc: Michael Tuts <tuts AT pmtuts.net>, "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28
  • Date: Fri, 28 Jun 2019 21:06:32 +0000

Hi Elliot,
  By chance I noticed this in Table 11:  Make 2/3rd of planned TP boards, 1/3rd RTM boards, and 5/6ths planned TFM boards
       Is this still a valid combination after the recent US contribution fraction changes of CORE?
  Cheers,

Jinlong 

On Jun 28, 2019, at 3:55 PM, Elliot Lipeles <lipeles AT hep.upenn.edu> wrote:


Hi Mike,

Here are the updates...

One big picture comments...

This statement implies that evolution to L1Track is a given, which it is not. I'm not sure if this implication was intentional or not:
"To achieve our goal of maintaining Run-1 efficiencies at viable bandwidths in a cost-effective manner, the ATLAS HL-LHC trigger system will consist of three levels, realized in a phased implementation. In the early period of HL-LHC running, before full luminosity is achieved, a simplified two-level trigger system will be employed to facilitate fast implementation"

Elliot


On Tue, Jun 11, 2019 at 4:39 PM Michael Tuts <tuts AT pmtuts.net> wrote:

Hi NSF scope L2’s,

We need your help. We need to update the NSF PEP for the DR and FDR. In particular there are sections in the PEP on the development period and the up/downscope options. They are section 3.1, 3.3, 4.4 in the PEP. Can you please take a look at your subsystem in those section (we will take care of cost tables/profiles) and correct/update the narrative in those section. The PEP can be found in DocDB #78 (Word file). Enter your changes using Word tracking changes, and send it to me, don’t upload to #78 as I will collect all the changes and then reupload. Please complete the changes before COB June 28.

Thanks, Mike



_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
<PEP US ATLAS HL-LHC2019-01-16.docx>_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l




Archive powered by MHonArc 2.6.24.

Top of Page