usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28
- From: Elliot Lipeles <lipeles AT hep.upenn.edu>
- To: Jinlong Zhang <zhangjl AT anl.gov>
- Cc: Michael Tuts <tuts AT pmtuts.net>, usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28
- Date: Fri, 28 Jun 2019 20:09:55 -0400
Hi Elliot,By chance I noticed this in Table 11: Make 2/3rd of planned TP boards, 1/3rd RTM boards, and 5/6ths planned TFM boardsIs this still a valid combination after the recent US contribution fraction changes of CORE?Cheers,
Jinlong
On Jun 28, 2019, at 3:55 PM, Elliot Lipeles <lipeles AT hep.upenn.edu> wrote:
Hi Mike,
Here are the updates...
One big picture comments...
This statement implies that evolution to L1Track is a given, which it is not. I'm not sure if this implication was intentional or not:"To achieve our goal of maintaining Run-1 efficiencies at viable bandwidths in a cost-effective manner, the ATLAS HL-LHC trigger system will consist of three levels, realized in a phased implementation. In the early period of HL-LHC running, before full luminosity is achieved, a simplified two-level trigger system will be employed to facilitate fast implementation"
Elliot
<PEP US ATLAS HL-LHC2019-01-16.docx>_______________________________________________On Tue, Jun 11, 2019 at 4:39 PM Michael Tuts <tuts AT pmtuts.net> wrote:
_______________________________________________Hi NSF scope L2’s,
We need your help. We need to update the NSF PEP for the DR and FDR. In particular there are sections in the PEP on the development period and the up/downscope options. They are section 3.1, 3.3, 4.4 in the PEP. Can you please take a look at your subsystem in those section (we will take care of cost tables/profiles) and correct/update the narrative in those section. The PEP can be found in DocDB #78 (Word file). Enter your changes using Word tracking changes, and send it to me, don’t upload to #78 as I will collect all the changes and then reupload. Please complete the changes before COB June 28.
Thanks, Mike
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28,
Elliot Lipeles, 06/28/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28,
Zhang, Jinlong, 06/28/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28, Elliot Lipeles, 06/28/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Need your help updating PEP for DR/FDR - before COB June 28,
Zhang, Jinlong, 06/28/2019
Archive powered by MHonArc 2.6.24.