Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: [Usatlas-hllhc-pomgmt-l] First draft at MREFC delay note
- From: Hal Evans <hgevans AT indiana.edu>
- To: John Parsons <parsons AT nevis.columbia.edu>, Michael Tuts <tuts AT pmtuts.net>, "usatlas-hllhc-pomgmt-l AT lists.bnl.gov" <usatlas-hllhc-pomgmt-l AT lists.bnl.gov>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: [Usatlas-hllhc-pomgmt-l] First draft at MREFC delay note
- Date: Thu, 12 Dec 2019 18:26:57 -0500
Hi Mike,
This looks good to me. Thanks for putting it together! Only one other small item: on the second-to-last bullet, I would remove "(even if we were able to support the standing army costs)". If we were able to fund these people as a standing army, we wouldn't lose them. I think that we make the point adequately by just saying "risk the loss of key personnel".
Thanks - Hal
On 12/12/19 6:17 PM, John Parsons wrote:
This message was sent from a non-IU address. Please exercise caution when clicking links or opening attachments from external sources.--
-------
I would suggest to move the last bullet (about the Risk register item) up to immediately after the chart, since it follows the logic of continuing on the current schedule, but having the end-date stretched out. In contrast, The bullets after the chart are about the impact of delaying the MREFC funding (ie. NOT continuing on our current schedule, but instead putting the project "on hold" for a year).
John
On 12/12/19 4:50 PM, Michael Tuts wrote:
Hi
Attached is a first draft of the MREFC note to Coles. I have to go offline for a few hours now, but will return this evening late. Comments/changes of course welcome.
Mike
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v
Hal Evans hgevans AT indiana.edu
https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=U0oJ38bFv3JsB9N8ubzlQDzQ2GJYyRIcRmtkEP2oSWw&s=LT8uh4X4TrYA6YTO1InjSRPmBDyDpbKonNuW7RwUK3Y&e= Tel: (812)856-3828 Fax: (812)855-5533
253 Swain Hall West Indiana University
727 E. Third St. Bloomington, IN 47405
v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] First draft at MREFC delay note,
Michael Tuts, 12/12/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First draft at MREFC delay note,
John Parsons, 12/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: [Usatlas-hllhc-pomgmt-l] First draft at MREFC delay note, Hal Evans, 12/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First draft at MREFC delay note, Michael Tuts, 12/13/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First draft at MREFC delay note,
John Parsons, 12/12/2019
Archive powered by MHonArc 2.6.24.