  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: John Parsons <parsons AT nevis.columbia.edu>, "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] May NSF VR reports
  • Date: Wed, 23 Jun 2021 09:21:37 +0200


There's a positive cost variance that's above threshold. We don't send those to NSF, but we still need the variance report.

On 6/23/21 3:23 AM, John Parsons wrote:

Why do we need a variance report for 6.4.1?  I thought we were only reporting on SPI, and it has 0.97 in May.  6.4.3 has SPI = 0.85, but is below $100k.  So I was assuming no LAr variance reports for May.

        John

On 6/22/21 10:37 AM, Gustaaf Brooijmans wrote:

Hello all,

The May variance reports are due:

6.4.1 is missing

6.6.3 is good

6.8.2 and 6.8.3 are missing

Please get the missing reports in asap.

Thanks!

Gustaaf
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l



--
Gustaaf Brooijmans - Columbia University
@Columbia: (212) 854 4527; Nevis virtual phone: (914) 591 2804

Als sie mich holten,
gab es keinen mehr, der protestieren konnte.




Archive powered by MHonArc 2.6.24.

Top of Page