[Usatlas-hllhc-l2deputymgmt-nsf-l] FDR and PRR dates from RLS
- From: Michael Tuts <tuts AT pmtuts.net>
- To: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] FDR and PRR dates from RLS
- Date: Wed, 4 Aug 2021 23:12:07 +0000
Hi L2’s, Following the recommendation from the DR, I have added an additional slide that includes some of the FDR and PRR dates for the systems I could find in the RLS (by searching for ‘fdr’ and ‘prr’ in the RLS schedule for each L2 from the detailed schedule in IPD). These are the BASELINE dates (not working schedule) in the RLS for the current baseline. Can you please check these dates (I have the task ID’s if you need them). The ones that are blank means I couldn’t find a corresponding task with a date – maybe you can fill that in (of course, presumably the dates *should* appear in the RLS, but maybe I just missed them).
The aim was simply to show that ATLAS has a QA process in place and we capture that in the RLS. By the way if the dates are wrong, then presumably they should be changed in the baseline RLS eventually.
Thanks, Mike
|