Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary
- From: Mark Oreglia <oreglia AT uchicago.edu>
- To: usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary
- Date: Wed, 4 Aug 2021 14:14:20 -0500
I apologise for setting a bad example, though it is really
      David's fault ;)
    
Sincerely, Mark Oreglia =-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=- Mark Oreglia Professor, Dept. of Physics The University of Chicago, The Enrico Fermi Institute The University of Chicago | m-oreglia AT uchicago.edu 5640 S. Ellis Av | Tel: (773) 702-7446 Chicago, IL 60637-1433 | Fax: (773) 702-1914 =-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
On 8/4/2021 1:17 PM, Thomas Schwarz
      wrote:
    
    
      
      UGH Mike, John!  I was done! :)
        
          
            
              
                
                  
                    
                  
                  
                
              
            
          
        
        ===================
                  
                  Tom Schwarz
                  Associate Professor
                  Department of Physics
                  University of Michigan 
                  Office: 734-764-8941
                  Lab: 734-763-7805
                  schwarzt AT umich.edu
                  
                  ===================
                  On Wed, Aug 4, 2021 at 2:16 PM
          Evans, Harold G. <hgevans AT indiana.edu> wrote:
        
        
          Hi John,
            Yes - it would be a good idea to insert the yellow
              charge question boxes on your slides.
            Best  -  Hal
            On Wed, 2021-08-04 at 14:09 -0400, John Parsons wrote:
            
              This message was sent from a non-IU address. Please exercise caution when clicking links or opening attachments from external sources.
-------
Can someone from the PO reply asap about the "yellow charge question
boxes"? I am working to finalize and post my slides, and want to know
if I need to go back and insert those.
Thanks,
John
On 8/4/21 11:24 AM, John Parsons wrote:
Very good, that is what I was also thinking.
Another question: I see Mark has gone back to adding the "yellow boxes"
wrt the charge questions. Should all L2 talks add this? I would expect
we will trigger additional unwanted discussions if some of us do and
some don't.
John
On 8/4/21 11:07 AM, Gustaaf Brooijmans wrote:
Hi,
On the no covid summary sheet the float table has base floats both
with and without the COVID BCPs. I would suggest to show both.
Best,
Gustaaf
On 8/4/21 4:20 PM, John Parsons wrote:
What about the float numbers? Do we show both with/without COVID?
For LAr, we have lost close to a year in float due to COVID. If I
show only the "no COVID" float, it will appear very misleading??
John
On 8/4/21 7:47 AM, Gustaaf Brooijmans wrote:
Hello all,
Attached is an updated contingency simulation summary sheet. Note
that the file now has two sheets: one where the base numbers include
the covid BCPs, and one where they don't. Based on the feedback
from the director's review, I think we should show the numbers
*without* the covid BCPs by default, and maybe have the others in
back-up.
I also attach the sheet with all the gory details, for your own
perusal.
Best,
Gustaaf
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
--
------------------------------------------------------------------------------
                 Hal Evans                        hgevans AT indiana.edu
                           http://hgevans.pages.iu.edu/
                 Tel: (812)856-3828                    Fax:
                  (812)855-5533
                 253 Swain Hall West               Indiana
                  University
                 727 E. Third St.                Bloomington, IN
                  47405
                ------------------------------------------------------------------------------
              Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
_______________________________________________ Usatlas-hllhc-l2deputymgmt-nsf-l mailing list Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
- 
        
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary
        , (continued)
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            Gustaaf Brooijmans, 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary, Michael Tuts, 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
            Evans, Harold G., 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
            Thomas Schwarz, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, Michael Tuts, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, David W Miller, 08/04/2021
 
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, Mark Oreglia, 08/04/2021
 
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
            Thomas Schwarz, 08/04/2021
 
 
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
 
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary, Gustaaf Brooijmans, 08/05/2021
 
 
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            Gustaaf Brooijmans, 08/04/2021
 
- 
            
            Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
            John Parsons, 08/04/2021
Archive powered by MHonArc 2.6.24.