usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary
- Date: Wed, 4 Aug 2021 14:09:34 -0400
Can someone from the PO reply asap about the "yellow charge question boxes"? I am working to finalize and post my slides, and want to know if I need to go back and insert those.
Thanks,
John
On 8/4/21 11:24 AM, John Parsons wrote:
Very good, that is what I was also thinking.
Another question: I see Mark has gone back to adding the "yellow boxes" wrt the charge questions. Should all L2 talks add this? I would expect we will trigger additional unwanted discussions if some of us do and some don't.
John
On 8/4/21 11:07 AM, Gustaaf Brooijmans wrote:
Hi,
On the no covid summary sheet the float table has base floats both with and without the COVID BCPs. I would suggest to show both.
Best,
Gustaaf
On 8/4/21 4:20 PM, John Parsons wrote:
What about the float numbers? Do we show both with/without COVID? For LAr, we have lost close to a year in float due to COVID. If I show only the "no COVID" float, it will appear very misleading??
John
On 8/4/21 7:47 AM, Gustaaf Brooijmans wrote:
Hello all,
Attached is an updated contingency simulation summary sheet. Note that the file now has two sheets: one where the base numbers include the covid BCPs, and one where they don't. Based on the feedback from the director's review, I think we should show the numbers *without* the covid BCPs by default, and maybe have the others in back-up.
I also attach the sheet with all the gory details, for your own perusal.
Best,
Gustaaf
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!S78mlYGL-pYe042DgZ5ZOPvGb1zmB2jmybSNEgv5RQHkVKWZVq1EA9142voulxEJfDZRg5XJQ_zBBo5atP6-2-Y2qK8B$
______________________________________________________________________
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
Gustaaf Brooijmans, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
Gustaaf Brooijmans, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary, Michael Tuts, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
Evans, Harold G., 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
Thomas Schwarz, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, Michael Tuts, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, David W Miller, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary, Mark Oreglia, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: Updated contingency simulation summary,
Thomas Schwarz, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary, Gustaaf Brooijmans, 08/05/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
Gustaaf Brooijmans, 08/04/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency simulation summary,
John Parsons, 08/04/2021
Archive powered by MHonArc 2.6.24.