Hi Mike,
Here's an annotated version. Mostly minor fixes of typos, just one big one. We cannot write "We passed a L0MDT BCP to re-align the baseline schedule with the working schedule due to increased complexity" in a report! You cannot do BCPs primarily to align the baseline and working schedules.
Best,
Gustaaf
On 9/27/21 7:27 PM, Michael Tuts wrote:
Hi All,
Attached is a draft of the August NSF monthly report. There are still a few known missing pieces – where you see some numbers in green that I should have tomorrow, and I am missing the 6.4.2 variance report (there is an empty placeholder for that in the report) so please upload that asap.
I will also send the annual report draft out soon.
Comments and corrections are always welcome.
Thanks, PO
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx,
Michael Tuts, 09/27/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx,
Gustaaf Brooijmans, 09/28/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx, Michael Tuts, 09/28/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx,
Michael Tuts, 09/28/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx, Gustaaf Brooijmans, 09/28/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] DRAFT 2021-08 ATLAS MREFC Project Status Report.docx,
Gustaaf Brooijmans, 09/28/2021
Archive powered by MHonArc 2.6.24.