Hello all,
A reminder that the December variance reports are due. Many thanks to those
who have filed in time. Below are my comments.
Thx
Gustaaf
6.4 is missing
6.4.1 looks good
6.4.2 is missing
6.4.3 looks good
6.5.3 looks good
6.5.4 is missing
6.6 looks good
6.6.1: so, is the cost variance real? If so, what is it due to? Savings on
parts? Or labor? Or is the correction that was made the mistake?
=> I’m unlocking this one
6.6.3 is fine => please submit it
6.6.4 is fine
6.6.5 is fine
6.8 is missing
6.8.3 is fine
6.8.4 is missing
6.10.2 is missing
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports,
Gustaaf Brooijmans, 01/23/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports,
Gustaaf Brooijmans, 01/24/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports, Michael Tuts, 01/24/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports, Gustaaf Brooijmans, 01/27/2023
- <Possible follow-up(s)>
- [Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports, Gustaaf Brooijmans, 01/23/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] December variance reports,
Gustaaf Brooijmans, 01/24/2023
Archive powered by MHonArc 2.6.24.