usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Thomas Schwarz <schwarzt AT umich.edu>
  • To: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • Cc: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons
  • Date: Mon, 20 Feb 2023 13:11:08 -0500

The left table is BCP 1028, which from what I've understood is the NSF baseline we were supposed to use for muons.  I can remove the "FDR" part of the label, if that's what you mean.

===================
Tom Schwarz
Associate Professor
Department of Physics
University of Michigan 
Office: 734-764-8941
Lab: 734-763-7805
===================



On Mon, Feb 20, 2023 at 1:00 PM Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu> wrote:

No, you should remove the left part, and any references to FDR.  The cost comparison is between NSF baseline and proposed new baseline.  FDR is irrelevant.

You can read off the costs at NSF baseline from the contingency log, as pointed out in the diff template.

On Feb 20, 2023, at 6:16 PM, Thomas Schwarz <schwarzt AT umich.edu> wrote:

So you want something like this - no associated chart for the before times...?

<Screenshot 2023-02-20 at 12.15.19 PM.png>



===================
Tom Schwarz
Associate Professor
Department of Physics
University of Michigan 
Office: 734-764-8941
Lab: 734-763-7805
===================



On Mon, Feb 20, 2023 at 11:39 AM Evans, Harold G. <hgevans AT indiana.edu> wrote:
Hi all,

A number of you have pointed out the difficulty in making an accurate comparison between the MREFC-start and rebaselined cost profiles for your system - thanks for catching this! Since the profile changed (even if only slightly) between the FDR and the MREFC start, we don't have the relevant charts for what the NSF actually distributed.

Our suggestion is that you modify your talks to show only the rebaselined cost and effort profiles. You should quote the total direct L2 system cost from the MREFC start for comparison with the rebaseline, using numbers from the BCP contingency log. But showing the FDR profile could cause confusion/contradiction.

I've updated the L2 talk template in google slides to reflect this change (slides 15,20).

Thanks  -  Hal
-- 
------------------------------------------------------------------------------
 Hal Evans                        hgevans AT indiana.edu
           http://hgevans.pages.iu.edu/
 Tel: (812)856-3828                    Fax: (812)855-5533
 204 Swain Hall West               Indiana University
 727 E. Third St.                Bloomington, IN 47405
------------------------------------------------------------------------------
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l




Archive powered by MHonArc 2.6.24.

Top of Page