Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons
- From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- To: Thomas Schwarz <schwarzt AT umich.edu>
- Cc: "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons
- Date: Mon, 20 Feb 2023 19:15:40 +0100
On Feb 20, 2023, at 7:11 PM, Thomas Schwarz <schwarzt AT umich.edu> wrote:The left table is BCP 1028, which from what I've understood is the NSF baseline we were supposed to use for muons. I can remove the "FDR" part of the label, if that's what you mean.===================Tom SchwarzAssociate ProfessorDepartment of PhysicsUniversity of MichiganOffice: 734-764-8941Lab: 734-763-7805===================On Mon, Feb 20, 2023 at 1:00 PM Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu> wrote:No, you should remove the left part, and any references to FDR. The cost comparison is between NSF baseline and proposed new baseline. FDR is irrelevant.You can read off the costs at NSF baseline from the contingency log, as pointed out in the diff template.On Feb 20, 2023, at 6:16 PM, Thomas Schwarz <schwarzt AT umich.edu> wrote:So you want something like this - no associated chart for the before times...?<Screenshot 2023-02-20 at 12.15.19 PM.png>===================Tom SchwarzAssociate ProfessorDepartment of PhysicsUniversity of MichiganOffice: 734-764-8941Lab: 734-763-7805===================_______________________________________________On Mon, Feb 20, 2023 at 11:39 AM Evans, Harold G. <hgevans AT indiana.edu> wrote:_______________________________________________Hi all,
A number of you have pointed out the difficulty in making an accurate comparison between the MREFC-start and rebaselined cost profiles for your system - thanks for catching this! Since the profile changed (even if only slightly) between the FDR and the MREFC start, we don't have the relevant charts for what the NSF actually distributed.
Our suggestion is that you modify your talks to show only the rebaselined cost and effort profiles. You should quote the total direct L2 system cost from the MREFC start for comparison with the rebaseline, using numbers from the BCP contingency log. But showing the FDR profile could cause confusion/contradiction.
I've updated the L2 talk template in google slides to reflect this change (slides 15,20).
Thanks - Hal--------------------------------------------------------------------------------Hal Evans hgevans AT indiana.eduTel: (812)856-3828 Fax: (812)855-5533204 Swain Hall West Indiana University727 E. Third St. Bloomington, IN 47405------------------------------------------------------------------------------
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Evans, Harold G., 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Thomas Schwarz, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Gustaaf Brooijmans, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Thomas Schwarz, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Gustaaf Brooijmans, 02/20/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons, Thomas Schwarz, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Gustaaf Brooijmans, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Thomas Schwarz, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Gustaaf Brooijmans, 02/20/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF DR: cost profile comparisons,
Thomas Schwarz, 02/20/2023
Archive powered by MHonArc 2.6.24.