usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "Meyer, Chris" <cjmey AT iu.edu>, "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Cc: "usatlas-hllhc-management-l AT lists.bnl.gov" <usatlas-hllhc-management-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results
- Date: Thu, 23 Feb 2023 20:33:34 -0500
Hi Chris,
Thanks, this is very interesting. After a quick glance at LAr, I would say the results seem fairly sensible, maybe a little bit more conservative in some cases than I would have predicted. Are you expecting to also produce soon MC results about the float? It would, of course, also be very interesting to see those results.
Regards,
John
On 2/23/23 7:30 PM, Meyer, Chris wrote:
Hi All,
I've attached the first version of the risk simulation results for the NSF director's review.
The NSF workbook is old enough that it doesn't contain the "For Presentation" tab found in more recent DOE reviews; I'll add this next, along with continuing general sanity checks of the results. In the meantime, the final tab in the workbook (Cost Range Analysis) is probably the best summary of the results to start digesting.
Cheers,
Chris
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!DJ1N6hK4q7z4Xic5Th7c-7DHdX7fSiG3liUq_vR2ZdtZM6mStT3cbq7RumMXhpuUT-63drL19THzrbJCyrh3qqbb58AAXB-Pkpb6HX2wH2Y08xLp1P850A$
______________________________________________________________________
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results,
Meyer, Chris, 02/23/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results,
John Parsons, 02/23/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results,
Meyer, Chris, 02/24/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [Usatlas-hllhc-management-l] First risk simulation results, Gustaaf Brooijmans, 02/24/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results,
Meyer, Chris, 02/24/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results,
John Parsons, 02/23/2023
Archive powered by MHonArc 2.6.24.