Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [Usatlas-hllhc-management-l] First risk simulation results

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: "Meyer, Chris" <cjmey AT iu.edu>
  • Cc: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>, "usatlas-hllhc-management-l AT lists.bnl.gov" <usatlas-hllhc-management-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [Usatlas-hllhc-management-l] First risk simulation results
  • Date: Fri, 24 Feb 2023 07:42:10 -0500


But we’ll be making the nice summary table later today as well.  Once a number of cross-checks are completed.

On Feb 24, 2023, at 7:35 AM, Meyer, Chris <cjmey AT iu.edu> wrote:

Hi John,

If you look at the earlier tabs for LAr the float for all L3s is included on the bottom half, you'll just need to pick out the critical path manually for now.

Cheers,
Chris


From: John Parsons <parsons AT nevis.columbia.edu>
Sent: Thursday, February 23, 2023 8:33:34 PM
To: Meyer, Chris <cjmey AT iu.edu>; Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
Cc: usatlas-hllhc-management-l AT lists.bnl.gov <usatlas-hllhc-management-l AT lists.bnl.gov>
Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] First risk simulation results
 

Hi Chris,

        Thanks, this is very interesting.  After a quick glance at LAr, I would
say the results seem fairly sensible, maybe a little bit more
conservative in some cases than I would have predicted.  Are you
expecting to also produce soon MC results about the float?  It would, of
course, also be very interesting to see those results.

        Regards,
                John

On 2/23/23 7:30 PM, Meyer, Chris wrote:
> Hi All,
>
> I've attached the first version of the risk simulation results for the
> NSF director's review.
>
> The NSF workbook is old enough that it doesn't contain the "For
> Presentation" tab found in more recent DOE reviews; I'll add this next,
> along with continuing general sanity checks of the results. In the
> meantime, the final tab in the workbook (Cost Range Analysis) is
> probably the best summary of the results to start digesting.
>
> Cheers,
> Chris
>
> _______________________________________________
> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
> https://nam12.safelinks.protection.outlook.com/?url="https%3A%2F%2Flists.bnl.gov%2Fmailman%2Flistinfo%2Fusatlas-hllhc-l2deputymgmt-nsf-l&data=05%7C01%7Ccjmey%40iu.edu%7C9a3a04999ea74321099208db16073190%7C1113be34aed14d00ab4bcdd02510be91%7C0%7C0%7C638127992378229857%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=auEo3BQm8%2FUzi5PLLa1AcdZGOB5xytOQVCrvdvowPcQ%3D&reserved=0

--
______________________________________________________________________

John Parsons
Nevis Labs,             
Email: parsons AT nevis.columbia.edu
  Columbia University   Phone: (914) 591-2820
P.O. Box 137            Fax: (914) 591-8120
Irvington, NY 10533     WWW: https://nam12.safelinks.protection.outlook.com/?url="http%3A%2F%2Fwww.nevis.columbia.edu%2F~parsons%2F&data=05%7C01%7Ccjmey%40iu.edu%7C9a3a04999ea74321099208db16073190%7C1113be34aed14d00ab4bcdd02510be91%7C0%7C0%7C638127992378229857%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV8Ji6ZcvEHHON6v%2F9LGat8b3FwpJiPG3otf4RIoUyE%3D&reserved=0

______________________________________________________________________
_______________________________________________
Usatlas-hllhc-management-l mailing list
Usatlas-hllhc-management-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-management-l




Archive powered by MHonArc 2.6.24.

Top of Page