usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab
- From: Michael Tuts <tuts AT pmtuts.net>
- To: Stephanie Majewski <smajewsk AT uoregon.edu>, Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- Cc: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab
- Date: Sat, 25 Feb 2023 23:29:37 +0000
I have a little on the methodology… have a look at my overview talk for EFT. See if you feel that is adequate.
From: Usatlas-hllhc-l2deputymgmt-nsf-l <usatlas-hllhc-l2deputymgmt-nsf-l-bounces AT lists.bnl.gov>
On Behalf Of Stephanie Majewski
Hi Gustaaf,
Jinlong and I both looked at this and it looks reasonable to us.
For the EF Tracking review, will Mike include any of these results in his overview or should I put the EF tracking number in the EF Tracking cost & schedule talk? It’s a little awkward without the description of the methodology, so I’m not sure what is best.
Thanks,
Stephanie
|
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab
, (continued)
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Chris Meyer, 02/27/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, John Parsons, 02/27/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Thomas Schwarz, 02/25/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Gustaaf Brooijmans, 02/26/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Thomas Schwarz, 02/26/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Gustaaf Brooijmans, 02/26/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Gustaaf Brooijmans, 02/26/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, John Parsons, 02/26/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Updated contingency sheet with "for presentation" tab, Michael Tuts, 02/25/2023
Archive powered by MHonArc 2.6.24.