Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - [Usatlas-hllhc-lartl2l3-l] Fwd: BCP 1010 LAr 6.04 NSF

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>, kj <johns AT physics.arizona.edu>, John Hobbs <John.Hobbs AT stonybrook.edu>
  • Subject: [Usatlas-hllhc-lartl2l3-l] Fwd: BCP 1010 LAr 6.04 NSF
  • Date: Wed, 1 May 2019 18:50:15 -0400


Hello all,

I append Heidi's email with the latest Scrubbing
Report after the changes I put in today to the NSF scope.
All the NSF changes I know of, except for a few new
(and minor) ones from Kj, are in by now, so I asked Heidi
to also produce the P6 "diff" report.
I need all NSF scope to urgently go carefully over
the reports and look for any issues requiring fixing. I
note there are some concerns:

1. the MREFC increase is ~$1.14M. I had expected the ~675k
increase for FEB2, which arises due to the new LTDB quotes.
I also expected some BE increase, due to Kj increasing some
mpwr, though John H. expected some SBU decrease due to the
sRTM. As of now, the BE increased by ~$238k, which is a
bit of a surprise. Also, FE increased by ~$227k, which is
also not so clear (decrease in ASIC costs was not enough
to compensate for increase in VTRx+?)

2. FE and FEB2 have small offsetting changes in preMREFC.
However, BE has increase of $57k! While a small number
compared to the MREFC costs, I do not see any way to get
such a preMREFC increase approved, since it would take
pretty much all the remaining preMREFC contingency! So,
we need to understand this, and see how to eliminate the
increase (by shifting it to MREFC if necessary).

All this is urgent. The hope is to bring the
BCP to the CCB on Wed. next week, so we need to find and
fix any problems this week in order to iterate and be
ready. So, please start looking asap!

Thanks,
John

-------- Forwarded Message --------
Subject: BCP 1010 LAr 6.04 NSF
Date: Wed, 1 May 2019 20:46:16 +0000
From: Heidi Crookston <heidi.crookston AT mrcpmcs.com>
To: John Parsons <parsons AT nevis.columbia.edu>
CC: Novakova, Penka N <penka AT bnl.gov>, Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>



Attached for your review is the Diff and Scrubbing Reports to support the BCP 1010 changes. The current changes were compared to the Admin Change for LAr currently in Cobra and the total change is $1,195,620 with MREFC equaling $1,140,438. Please advise of changes needed.

Thanks,

Heidi

**

**

**

*Heidi Crookston*

/Senior Project Controls Consultant/

----------------------------

cid:E6019E4F-24C0-4B29-9A83-D746318DE6B2

Manta Ray Consulting, Inc.
New York, NY

CELL:  1-616-581-6658

_heidi.crookston AT mrcpmcs.com <mailto:heidi.crookston AT mrcpmcs.com>_
_https://urldefense.proofpoint.com/v2/url?u=http-3A__www.mrc-2Dpmcs.net&d=DwID-g&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=Fn1rO6KSOzwV69QhiB0dYIlotP5tnJv-r-0uvQduyyU&s=6utn97pJXHuPd2Kk1qwsgv3CmkRrQNNnxKf7FskZRTk&e=

<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.mrc-2Dpmcs.net_&d=DwID-g&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=Fn1rO6KSOzwV69QhiB0dYIlotP5tnJv-r-0uvQduyyU&s=iar94w_BzSFwSevl31j7Ad0hRl2a4AeKHfD-m32K7Rw&e=>_

Attachment: BCP 1010 6.04 LAr Cobra B4 and Aft Report 20190501.xlsx
Description: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet

Attachment: AP2 6.04 LAr Scrubbing Report 20190501.xlsm
Description: application/vnd.ms-excel.sheet.macroenabled.12



  • [Usatlas-hllhc-lartl2l3-l] Fwd: BCP 1010 LAr 6.04 NSF, John Parsons, 05/01/2019

Archive powered by MHonArc 2.6.24.

Top of Page