Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: Tim Andeen <timothy.robert.andeen AT cern.ch>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2
- Date: Thu, 11 Jul 2019 17:50:42 -0400
Hi Tim,
Does it properly reflect the update % sharing
from the recent adjustments? I think the optics needs
to be updated, right?
John
On 7/8/19 5:12 AM, Tim Andeen wrote:
Hi John,
What is in there now is good. I think I iterated on this Gustaaf a week(?) ago, and it's still OK.
Best, Tim
On Fri, Jul 5, 2019 at 6:39 PM John Parsons <parsons AT nevis.columbia.edu <mailto:parsons AT nevis.columbia.edu>> wrote:
Tim/Andy,
Something that needs to be filled out for ICE.
Please get it back to me by COB on Wed. July 10 so I have
time to put it together.
Regards,
John
-------- Forwarded Message --------
Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2
Date: Fri, 5 Jul 2019 10:36:19 -0400
From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu
<mailto:gusbroo AT nevis.columbia.edu>>
To: Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
<Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>>
Hello all,
So-called "phase-1" of the ICE (Independent Cost Estimate) is now
coming
to a close. After some struggles, we agreed that the BOEs were too
complex and that the starting point for the ICE would be a master
spreadsheet listing the documents used to
a) explain what the deliverable is, and
b) obtain quotes
Attached is the master sheet, which we need to send to NSF fully filled
out on July 15. Therefore, we need you to return it by *COB Thursday
July 11*.
The sheet is largely self-explanatory, but the Tile Main Board can
serve
as an example. What you need to do is
1) Check that I got all the relevant lines, i.e. all the lines that
include material costs relevant to deliverable construction
2) Fill out columns H to Q. In many cases I put in educated guesses,
these may be wrong. A few specific comments:
*J: this is an index to indicate if multiple payments correspond
to a
single quote (eg Tile Main Board assembly batches)
*M: make sure you have these documents: in a few more weeks we'll
need to provide them so they can get quotes. Looking through the
packages put together for our initial attempt, I did not always see
gerber files where I expected them)
*O: to my knowledge, only ASICs made under the CERN frame contract
only have one possible vendor, but that may be incorrect.
*P: indicate here if you applied any kind of scaling, eg because
you
used a different board's gerber to get a quote
*Q is about documentation that explains the deliverable, but is not
used in obtaining quotes.
Any questions, let us know.
Best,
Gustaaf
_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l
--
---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch <http://tandeen.web.cern.ch>
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX): +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu <mailto:tandeen AT utexas.edu>
---------------
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=BklsKU99Xds-MDTKKVkPC6W249BBavOh5SCNd5bm--E&s=O7e96Gg9os-AX8nH4jyT5FyUK-v3K4Nr8YzZmuvdo5s&e=
______________________________________________________________________
-
[Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2,
John Parsons, 07/05/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2,
Tim Andeen, 07/08/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2,
John Parsons, 07/11/2019
- Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2, Tim Andeen, 07/12/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2,
John Parsons, 07/11/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2deputymgmt-nsf-l] NSF ICE sheet, phase-2,
Tim Andeen, 07/08/2019