usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List
List archive
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "Ma, Hong" <hma AT bnl.gov>, Andy Haas <andy.haas AT nyu.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due
- Date: Tue, 19 Nov 2024 16:07:11 -0500
I am confident the PO would have a way to "recover" the "excess" funds, if it is really true that some work was cheaper than anticipated and therefore the funds are no longer needed.
I would normally say to just keep the funds, since we might need them later. However, not sure Andy wants to write VRs every month forever!
John
On 11/19/24 3:46 PM, Ma, Hong wrote:
But that was in the past, which can not be changed, unless there is a re-baseline.
Or we can reduce the cost of the future tasks, to burn the positive CV off?
Best,
Hong.
*From: *usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc- lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
*Date: *Tuesday, November 19, 2024 at 3:41 PM
*To: *Andy Haas <andy.haas AT nyu.edu>
*Cc: *usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3- l AT lists.bnl.gov>
*Subject: *Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc- l2deputymgmt-nsf-l] ] October VRs are due
At some point you should be prepared to answer whether we should change
P6 to "recover" these funds (ie. give them back to contingency). The CV
for SBU is ~ +$300k, so a considerable sum.
John
On 11/19/24 12:17 PM, Andy Haas wrote:
Hooray!
Done.
I wasn't so sure what to put for "impact" or "corrective action". You
can read what I put, below.
Explanation of Variance/Description of Problem:
There is a positive CV, mainly from work at SBU which has cost less
than expected due to lower component costs for test boards, which no
longer require an FPGA, as well as from lower than expected labor
costs. LASP delays have also caused money not to be spent on expensive
LASPs and LASP test stands, but tests performed with existing dev kits
and infrastructure.
Impact (including impact on EAC):
None.
Corrective Action:
Costs will rise soon, due to purchasing major parts (FPGAs and
Firefly's) for production, which will significantly decrease the
fractional CV that has been accumulated.
On Tue, Nov 19, 2024 at 8:26 AM John Parsons <parsons AT nevis.columbia.edu>
wrote:
Hi Tim/Andy (and me),
Please take care of the October VRs today and let me know when you
are
done, so that I can file the L2 VR. @Andy, note that your SPI is now
above 0.9 (congratulations!), so you only have to explain the (positive) CV.
Regards,
John
-------- Forwarded Message --------
Subject: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due
Date: Mon, 18 Nov 2024 15:50:29 -0500
From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
Reply-To: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
To: usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Hello all,
Please remind your teams that VRs are due in a couple of days.
Thanks,
Gustaaf
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW: https://urldefense.com/v3/__http:// https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!__;Kg!!P4SdNyxKAPE!GLVHN7yPxI_MgEAef35DZ2tffANtAk33g87pKx8m9kVoP97WMAbMccIcvJHJm6Qr2_inVO90EsIJ63hMwH0ztZx3ApvqmM496nHrbGvwSD0m3A$ CW0hXECDf7dKqJyB79z7TGKs3FjTO-o7BWorAGtpRTeyCMdZsmWoSmT1RTbpmWsO- hKL-9PoUjODVRTWbts3byuwz-cLOPZK6oQlUOsarG9uGQ$ <https://urldefense.com/ v3/__https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!__;Kg!!P4SdNyxKAPE!GLVHN7yPxI_MgEAef35DZ2tffANtAk33g87pKx8m9kVoP97WMAbMccIcvJHJm6Qr2_inVO90EsIJ63hMwH0ztZx3ApvqmM496nHrbGvwSD0m3A$ CW0hXECDf7dKqJyB79z7TGKs3FjTO-o7BWorAGtpRTeyCMdZsmWoSmT1RTbpmWsO- hKL-9PoUjODVRTWbts3byuwz-cLOPZK6oQlUOsarG9uGQ$>
______________________________________________________________________
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!GLVHN7yPxI_MgEAef35DZ2tffANtAk33g87pKx8m9kVoP97WMAbMccIcvJHJm6Qr2_inVO90EsIJ63hMwH0ztZx3ApvqmM496nHrbGstTYosHA$
______________________________________________________________________
-
[[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
John Parsons, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
Andy Haas, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
John Parsons, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
Ma, Hong, 11/19/2024
- Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due, John Parsons, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
Ma, Hong, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
John Parsons, 11/19/2024
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2deputymgmt-nsf-l] ] October VRs are due,
Andy Haas, 11/19/2024
Archive powered by MHonArc 2.6.24.