phys-npps-mgmt-l AT lists.bnl.gov
Subject: NPPS Leadership Team
List archive
- From: Torre Wenaus <wenaus AT gmail.com>
- To: NPPS leadership team <Phys-npps-mgmt-l AT lists.bnl.gov>
- Subject: [Phys-npps-mgmt-l] EIC software
- Date: Mon, 27 Jan 2020 12:34:34 -0500
2020-2021: Yellow Report detector design and physics performance studies
Software work in support:
Community: detector simu, reco, analysis software
Labs:
software framework and toolkit for simu, reco
fast simulation
analysis tools
doc, tutorials
software infrastructure
distributed processing support (data and workload management)
2022-2026: Detector development, test beams
Software work in support:
Community: detector simu, reco, analysis software
Community and lab
integrating streaming DAQ and offline computing in online+offline processing workflows
Labs: as above
BNL EIC software effort
Today: ½ FTE
½ FTE of computing infrastructure (Maxim) is the only dedicated effort at BNL (besides Torre time on coordination). Small fractions of people with commitments elsewhere. Particularly Chris leveraging sPHENIX software, Kolya supporting eic-smear, Alexander and Elke’s postdocs.
in contrast, JLab has large fractions of Markus Diefenthaler (coordination, evgen), Dmitry Romanov (jupyter based interfaces, tutorials, simu and reco infrastructure), Julia Furletova (g4e simu framework), David Alexander and the Jana team (reco)
ASAP: increase to 2 FTE
EIC is starting a new ‘greenfield’ framework/simu/reco development effort. If we want to play a role, we need effort
Add 1 FTE ASAP framework/simu/reco developer to participate in greenfield effort
Bring computing support effort to 1 FTE. Effort up to now is mainly collaborative tools, websites etc. With software development consolidating to common community efforts, we need software support (repositories, releases, containers, documentation tools) and user support in addition.
2021: increase to 3.5 FTE
Add a second dedicated software developer working both on common framework (including contributing to user support and documentation) and BNL-specific software priorities as the detector collaboration(s) and institutional responsibilities take shape
Add ½ FTE for processing support: distributed computing, platform porting, analysis processing. A small level that leverages existing activity.
2022-2026: flat planning for now, sustain 3.5 FTEs
-
[Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
pinkenburg, 01/27/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Brett Viren, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
alexei, 01/28/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/28/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
alexei, 01/28/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
- <Possible follow-up(s)>
-
Re: [Phys-npps-mgmt-l] EIC software,
Alexander Kiselev, 01/27/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
pinkenburg, 01/27/2020
Archive powered by MHonArc 2.6.24.