phys-npps-mgmt-l AT lists.bnl.gov
Subject: NPPS Leadership Team
List archive
- From: Alexander Kiselev <kisselev AT mail.desy.de>
- To: "wenaus AT gmail.com" <wenaus AT gmail.com>
- Cc: NPPS leadership team <Phys-npps-mgmt-l AT lists.bnl.gov>
- Subject: Re: [Phys-npps-mgmt-l] EIC software
- Date: Mon, 27 Jan 2020 21:45:44 +0100 (CET)
Torre,
this all sounds good to me. The person at JLAB is David Lawrence, not David Alexander :-)
Cheers,
Alexander.
On Mon, 27 Jan 2020, Torre Wenaus via Phys-npps-mgmt-l wrote:
Hi all,
Jamie asked for input on BNL EIC sw effort as input to the NP budgeting going
on right now. Here's my first version. Comments appreciated.
*
2020-2021: Yellow Report detector design and physics performance studies
+
Software work in support:
o
Community: detector simu, reco, analysis software
o
Labs:
o
software framework and toolkit for simu, reco
o
fast simulation
o
analysis tools
o
doc, tutorials
o
software infrastructure
o
distributed processing support (data and workload management)
*
2022-2026: Detector development, test beams
+
Software work in support:
o
Community: detector simu, reco, analysis software
o
Community and lab
o
integrating streaming DAQ and offline computing in
online+offline processing workflows
o
Labs: as above
BNL EIC software effort
*
Today: ½ FTE
+
½ FTE of computing infrastructure (Maxim) is the only dedicated
effort at BNL (besides Torre time on coordination). Small fractions of people
with commitments elsewhere.
Particularly Chris leveraging sPHENIX software, Kolya supporting
eic-smear, Alexander and Elke’s postdocs.
+
in contrast, JLab has large fractions of Markus Diefenthaler
(coordination, evgen), Dmitry Romanov (jupyter based interfaces, tutorials,
simu and reco infrastructure), Julia
Furletova (g4e simu framework), David Alexander and the Jana team
(reco)
*
ASAP: increase to 2 FTE
+
EIC is starting a new ‘greenfield’ framework/simu/reco development
effort. If we want to play a role, we need effort
o
Add 1 FTE ASAP framework/simu/reco developer to participate in
greenfield effort
+
Bring computing support effort to 1 FTE. Effort up to now is mainly
collaborative tools, websites etc. With software development consolidating to
common community efforts, we
need software support (repositories, releases, containers,
documentation tools) and user support in addition.
*
2021: increase to 3.5 FTE
+
Add a second dedicated software developer working both on common
framework (including contributing to user support and documentation) and
BNL-specific software priorities as
the detector collaboration(s) and institutional responsibilities take
shape
+
Add ½ FTE for processing support: distributed computing, platform
porting, analysis processing. A small level that leverages existing activity.
*
2022-2026: flat planning for now, sustain 3.5 FTEs
Torre
-
[Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
pinkenburg, 01/27/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Brett Viren, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
alexei, 01/28/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/28/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
alexei, 01/28/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
Torre Wenaus, 01/27/2020
- <Possible follow-up(s)>
-
Re: [Phys-npps-mgmt-l] EIC software,
Alexander Kiselev, 01/27/2020
- Re: [Phys-npps-mgmt-l] EIC software, Torre Wenaus, 01/27/2020
-
Re: [Phys-npps-mgmt-l] EIC software,
pinkenburg, 01/27/2020
Archive powered by MHonArc 2.6.24.