Skip to Content.
Sympa Menu

sphenix-calibration-l - Re: [Sphenix-calibration-l] Input for Collaboration Meeting

sphenix-calibration-l AT lists.bnl.gov

Subject: Sphenix-calibration-l mailing list

List archive

Chronological Thread  
  • From: Ross Corliss <rcorliss AT mit.edu>
  • To: Hugo Pereira Da Costa <hugo.pereira-da-costa AT cea.fr>
  • Cc: sphenix calibrations <sphenix-calibration-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-calibration-l] Input for Collaboration Meeting
  • Date: Mon, 7 Jun 2021 19:13:43 +0000

HI Hugo et al.,

I think the details of how the distortions are derived and combined (hence
the flow chart -- probably a
'rev 3', with the 'validate' step fleshed out) would be good to show, along
with the status of the components. This matches a lot of Hugo's comments.
Some of the details of the central membrane distortion monitoring (which we
will discuss tomorrow, and hopefully have a pull request before the collab
meeting) have also progressed since last time.

I would be glad to assemble the slides and present the status.

-Ross
> On Jun 7, 2021, at 12:14 PM, Hugo Pereira Da Costa via
> sPHENIX-calibration-l <sphenix-calibration-l AT lists.bnl.gov> wrote:
>
> Hello Christof, (repeating here what we discussed semi-privately)
>
> On the track-based space charge distortion reconstruction, there really
> have not been much new things since last collaboration meeting, mainly
> because things where in a reasonable state by then already.
>
> Obviously, there have been developments on making the TPOT happening for
> real (something which is critical to track-based SC corrections), but I
> expect this to be covered in a separate talk in the detector section
>
> To me, the newest thing that should really be presented at the
> collaboration meeting is the effort, led by Ross, to put all the bits and
> pieces we have on the TPC SC distortion correction in a comprehensive flow
> chart, organized in a first-pass and second-pass reconstruction.
>
> We should then emphasize which parts of this flowchart are already there
> (committed, ready to use), which are 'almost there', and which still need
> some significant work. I'll let Ross comment on this (and hopefully
> volunteer to present this).
>
> On that topic, one of the missing parts of the flow-chart, namely the
> ability for the first-pass reconstruction to store the per-job space-charge
> correction matrices in independent, tiny files, together with a separate
> process to aggregate, invert these matrices and produce a full map, has
> been pushed to our repositories last week. So we are one step closer to
> having this flow chart turned into a real thing.
>
> That is all the input I have.
>
> Best,
>
> Hugo
>
>
>
> On 6/4/2021 8:58 AM, Christof Roland via sPHENIX-calibration-l wrote:
>> Thanks to Klaus for pointing this out, obviously the mail should
>> have started with "DeaR Calibration TaskFocre Members"
>>
>> I sincerely apologize!
>>
>> This will go onto my list of the more memorable typos or autocorrect
>> failures.
>>
>> Cheers
>>
>> Christof
>>
>>
>>> On 4. Jun 2021, at 16:40, Christof Roland via sPHENIX-calibration-l
>>> <sphenix-calibration-l AT lists.bnl.gov> wrote:
>>>
>>> Dead Calibration TaskForce Members,
>>>
>>> we are supposed to provide feedback to Dave & Gunther so they
>>> can set up the program for the upcoming collaboration meeting.
>>>
>>> Could you please provide us with a few line response on the
>>> topics you would want to highlight at the collaboration meeting?
>>>
>>> Please also let us know if you would prefer the usual layout
>>> if a separate report by each subcommittee or if we should
>>> change for this particular meeting to a shorter executive style
>>> report to keep the meeting time short and leaving more time for
>>> discussion, as Gunther and Dave suggested last General Meeting
>>>
>>> Cheers
>>>
>>> Takao & Christof
>>> _______________________________________________
>>> sPHENIX-calibration-l mailing list
>>> sPHENIX-calibration-l AT lists.bnl.gov
>>> https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l
>> _______________________________________________
>> sPHENIX-calibration-l mailing list
>> sPHENIX-calibration-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l
> _______________________________________________
> sPHENIX-calibration-l mailing list
> sPHENIX-calibration-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/sphenix-calibration-l





Archive powered by MHonArc 2.6.24.

Top of Page