Skip to Content.
Sympa Menu

sphenix-magnet-l - Re: [Sphenix-magnet-l] Remaining hours of drilling / tapping ~ 579 hours

sphenix-magnet-l AT lists.bnl.gov

Subject: sPHENIX discussion of the superconducting solenoid

List archive

Chronological Thread  
  • From: "Hock, Jonathan" <jhock AT bnl.gov>
  • To: "O'Brien, Edward" <eobrien AT bnl.gov>, "Folz, Charles" <cfolz AT bnl.gov>, "Yip, Kin" <kinyip AT bnl.gov>, "Christie, William" <christie AT bnl.gov>
  • Cc: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>, "Kobasiuk, Frederick D" <kobasiuk AT bnl.gov>
  • Subject: Re: [Sphenix-magnet-l] Remaining hours of drilling / tapping ~ 579 hours
  • Date: Thu, 16 Feb 2017 19:21:52 +0000

All,

 

The flame cutting of the steel (welder) is 85% complete, hopefully by next next week, the welder will be finished. So the coordination will directly under CAD control.

 

From: sphenix-magnet-l-bounces AT lists.bnl.gov [mailto:sphenix-magnet-l-bounces AT lists.bnl.gov] On Behalf Of Edward O'Brien
Sent: Thursday, February 16, 2017 2:15 PM
To: Folz, Charles; Yip, Kin; Christie, William
Cc: sphenix-magnet-l AT lists.bnl.gov; Kobasiuk, Frederick D
Subject: Re: [Sphenix-magnet-l] Remaining hours of drilling / tapping ~ 579 hours

 

    Charlie,
     I agree with you. Depending on how Jon Hock did his estimate,
    this "inefficiency" could be built into his numbers, but
    the schedule for these type of projects rarely scale
    with the  number of people working on them.

    Ed

On 2/16/17 2:08 PM, Folz, Charles wrote:

Ed:

 

It will most likely not go quite that “linearly”. There is significant coordination required with both the Welder(s), (not directly under CAD control) and the Riggers to stage, cut and move the pieces to and from the drilling area.

 

Charlie

 

 

From: Edward O'Brien [mailto:eobrien AT bnl.gov]
Sent: Thursday, February 16, 2017 2:05 PM
To: Yip, Kin; Folz, Charles; Christie, William
Cc: sphenix-magnet-l AT lists.bnl.gov; Kobasiuk, Frederick D
Subject: Re: [Sphenix-magnet-l] Remaining hours of drilling / tapping ~ 579 hours

 

    Hi Kin,
     Thanks for the information. So if we can
    get 2 people to work full time on the drilling
    with two drills then this will take ~9 weeks
    once we factor in contingency. In a perfect world adding
    an additional person with an additional drill would
    reduce the 9 weeks to 6 weeks, but it is unlikely we would
    be able to work so efficiently that we'd be able to
    have that much schedule savings.
     Lets get going with two techs continuously drilling and
    tapping and in the mean time we'll see if it is possible
    to add a third person and drill.

    Ed
   

On 2/16/17 1:35 PM, Yip, Kin wrote:

Hi,

 

Thanks for the comment.  Though the no. of man-hours doesn't change, the no. of hours in time (if we can truly use two drills simultaneously all the time) will hopefully cut in half, right ?

 

Sent from my Verizon 4G LTE Smartphone

 

------ Original message------

From: Folz, Charles

Date: Thu, Feb 16, 2017 1:14 PM

To: Yip, Kin;Christie, William;

Subject:RE: Remaining hours of drilling / tapping ~ 579 hours

 

All:

 

Please note that the use of two drills does not cut the required labor hours in half. There may be some economy gained by having two technicians able to provide mutual assistance to each other, but the required labor hours is still in the area of 579.

 

Charlie

 

From: Yip, Kin
Sent: Thursday, February 16, 2017 12:42 PM
To: Christie, William
Cc: sphenix-magnet-l AT lists.bnl.gov; Folz, Charles; Kobasiuk, Frederick D
Subject: Remaining hours of drilling / tapping ~ 579 hours

 

Hello Bill,

 

As I mentioned to you yesterday,  attached is a spreadsheet from Jon Hock that shows the technician hours needed to finish drilling holes in steel for sPhenix High-Field Test.  It does not include assembly hours for technicians, survey, etc…

 

After a couple modification (and timing observation), he came up with 579 hours for the remaining hours

of drilling and tapping.   ( For management type of people, you can add 25% contingency J )

 

Even with two drills at the same time, 579/2 ~290 hours is still a lot of hours remained to be done.  We need

all the help that we can get J

 

Kin

 





_______________________________________________
sPHENIX-magnet-l mailing list
sPHENIX-magnet-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/sphenix-magnet-l

 

 




Archive powered by MHonArc 2.6.24.

Top of Page