sphenix-magnet-l AT lists.bnl.gov
Subject: sPHENIX discussion of the superconducting solenoid
List archive
[Sphenix-magnet-l] Short-circuit test : Current log not perfect yet
- From: Kin Yip <kinyip AT fnal.gov>
- To: "sphenix-magnet-l AT lists.bnl.gov" <sphenix-magnet-l AT lists.bnl.gov>
- Subject: [Sphenix-magnet-l] Short-circuit test : Current log not perfect yet
- Date: Thu, 21 Dec 2017 21:59:53 +0000
1.
I understand that for yesterday, we didn't log until Carl called Winston towards the end or something ...
2.
I also attach the latest Cryo situation (HMI Display). The temperatures for the magnet is ~220 K. The dropping slope seems to be 0.5 K/hour. 3.
Due to short-circuit tests for parts of the days, Paul Giannotti/Frank Toldo and today Peter Zimmerman haven’t been able to finished the connections. 4.
I also make an appointment with Mike Lenz at 8:30 am to let him disconnect the temporary cover, connect the MCM cables so that he can take
connected to Magnet.
Kin |
Attachment:
Currents.jpeg
Description: Currents.jpeg
Attachment:
2017-12-21 Cool-down.jpg
Description: 2017-12-21 Cool-down.jpg
- [Sphenix-magnet-l] Short-circuit test : Current log not perfect yet, Kin Yip, 12/21/2017