- [Sphenix-magnet-l] Plan to cool-down (End-walls to be closed next ~Wed. and then cool-down), Kin Yip, 12/01/2017
- [Sphenix-magnet-l] pre-loading still not right ... Doing it the last time tomorrow morning (with Jon there) !, Kin Yip, 12/05/2017
- [Sphenix-magnet-l] Reminder of today's sPHENIX Magnet Biweekly Meeting (1:30 pm at 902 conf. room), Yip, Kin, 12/06/2017
- [Sphenix-magnet-l] Brief Summary of sPHENIX biweekly meeting (Dec. 6, 2017) at 1:30 pm at 902 conference room, Yip, Kin, 12/06/2017
- [Sphenix-magnet-l] Brief Summary of sPHENIX biweekly meeting (Dec. 6, 2017) at 1:30 pm at 902 conference room (2nd try ... complete this time), Yip, Kin, 12/06/2017
- [Sphenix-magnet-l] Finished installing the "Hall probes" ... End-walls next Monday/Tuesday <=== cool-down after that, Yip, Kin, 12/08/2017
- [Sphenix-magnet-l] one bad RTD ... but I found a replacement from Len Masi, Kin Yip, 12/08/2017
-
[Sphenix-magnet-l] Gaussmeter measurements can be seen on GPM (in C-AD Control System) already,
Kin Yip, 12/08/2017
- Re: [Sphenix-magnet-l] Gaussmeter measurements can be seen on GPM (in C-AD Control System) already, John Haggerty, 12/08/2017
- [Sphenix-magnet-l] RTD measuring 7... Linear pot ..., Yip, Kin, 12/11/2017
- [Sphenix-magnet-l] Plant at full capacity ... waiting to re-start (to cool down) after we can install the end-walls, Kin Yip, 12/11/2017
- [Sphenix-magnet-l] > half-closed ... cool down immediately after the end-walls are installed ! Please let me know if you have any objection., Yip, Kin, 12/12/2017
- [Sphenix-magnet-l] last piece of steel ... 1st thing tomorrow morning., Yip, Kin, 12/13/2017
-
[Sphenix-magnet-l] Finally closed...pleasr start cool-down,
Yip, Kin, 12/14/2017
- [Sphenix-magnet-l] We are starting cool-down, Yip, Kin, 12/14/2017
- [Sphenix-magnet-l] Cool-down in progress (unaffected by network outage) --- ~0.6 K an hour, Yip, Kin, 12/16/2017
-
[Sphenix-magnet-l] ~255-260 K,
Yip, Kin, 12/18/2017
-
Re: [Sphenix-magnet-l] ~255-260 K,
EdwardOBrien, 12/18/2017
-
Re: [Sphenix-magnet-l] ~255-260 K,
Yip, Kin, 12/18/2017
- Re: [Sphenix-magnet-l] ~255-260 K, EdwardOBrien, 12/18/2017
- Re: [Sphenix-magnet-l] ~255-260 K, Than, Yatming (Roberto), 12/18/2017
- Re: [Sphenix-magnet-l] ~255-260 K, Yip, Kin, 12/18/2017
-
Re: [Sphenix-magnet-l] ~255-260 K,
Yip, Kin, 12/18/2017
-
Re: [Sphenix-magnet-l] ~255-260 K,
EdwardOBrien, 12/18/2017
- [Sphenix-magnet-l] Reminder of today's sPHENIX Magnet Biweekly Meeting in the 902A conference room at 1:30 pm on Dec. 20, 2017, Yip, Kin, 12/20/2017
- [Sphenix-magnet-l] List of things to be done for the High-Field Test, Yip, Kin, 12/20/2017
-
[Sphenix-magnet-l] Brief Summary of Today's sPHENIX Magnet biweekly meeting (Dec. 20, 2017) at 1:30 pm at the 902A conf. room,
Yip, Kin, 12/20/2017
- [Sphenix-magnet-l] PK's wooden blocks help ! ... Only 133 F :-), Kin Yip, 12/20/2017
- [Sphenix-magnet-l] Short-circuit test : Current log not perfect yet, Kin Yip, 12/21/2017
- [Sphenix-magnet-l] Winston has just created the Elog for "sPHENIX-Magnet-High-Field-Test_2018, Kin Yip, 12/22/2017
- [Sphenix-magnet-l] ~180 F (X'mas morning), Yip, Kin, 12/25/2017
- [Sphenix-magnet-l] < 150K ... Cryo switches tomorrow ... Paul Giannotti works until night ..., Yip, Kin, 12/27/2017