Minutes shift change 2023-04-14
General:
—————
- shield wall is in
- EMCal North preamp cooling enabled
evening: Oliver
- MVTX chiller alarm
- Cameron instructed to turn off chiller
night: Ejiro
- incident free
day: Virginia
- exit sign smoking, disconnected
MBD (Mickey)
- LOTOed out of HV rack
- lock cut
- electrician still need to work -> tomorrow
- will check out detector -> Sunday
HCal (Virginia)
MVTX (Cameron)
- started taking cosmics
- ironing out issues in procedure
- should hand over to shifters in an hour
EMCal (Sean)
- still working on mapping out detector
- tested interlocks for cooling water for preamps
- one bad flow switch that needs to be changed
- will leave 3/4 of North on
- shift crew should monitor EMCal LV, temperature, flow
TPOT
- no report
TPC (Takao)
- LV was off, not much happened
- Jin has been checking connection of fibers to rack electronics properly connected except for one, good progress
INTT (Rachid)
- all cooling
- working on commissioning on North
MVTX (Cameron)
- all three cooling lines now working
- when setting up for system test found that fiber connections were wrong
- working on fixing that
sEPD (Rosi)
- both N and S frames in
- part of optical fibers there, soon to be mounted
DAQ (Martin)
- seems to be working ok
- couple little hick ups
- first event wrong
- ghost ADC board
- slow control machine set up in rack room for direct control in addition to opc
- can read out multiple DCMs from single controller
Magnet (Kin)
- still problem with hipot test
Gas/cooling water (Rob)
Magnet (Kin)
- still problem with hipot test
Gas/cooling water (Rob)
- ECW flow rebalanced, bypasses off
- EMCal preamp cooling North on (3/4) (see above)
Plan of the day
- Shift crew monitor EMCal preamp cooling
-
---------------------------------------------------------------------------------
Stefan Bathe
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
Baruch College, CUNY
and RIKEN Visiting Scientist
Baruch: BNL:
17 Lexington Ave Bldg. 510
office 940 office 2-229
phone 646-660-6272 phone 631-344-8490
----------------------------------------------------------------------------------
- [Sphenix-run-l] Minutes shift change 2023-04-14, Stefan Bathe, 04/14/2023
Archive powered by MHonArc 2.6.24.