Minutes shift change 2023-04-22

evening:  Cameron
- quiet shift, some subsystem people working

night:  Charles
- even less exciting
- no alarms

day:  Sean
- quiet
- Kevin wired in EMCal flow switch
- still needs to be tied into interlock and tested
- John H and John K in
- exercised EMCal SiPM cooling

MBD (Mickey)
- looked into why we weren’t seeing the laser
  - no clock out of the clockmaster
  - needs to be fixed

HCal (Hanpu)
- working on setup script for cosmics running with Silas
- kept LV and bias off

EMCal (Sean/John)
- exercising cooling
- flow switch fixed
- bias up for the first time! (except for one interface board
  - took LED data for the first time! 
- logging EMCal bias into db1 daq database
  - not able to read back out
  - not able to connect root to it
  —> talk to Chris

TPOT (John K)
- no work

TPC (John K)
- finished setting up second pulser
- found from testing that one of the spark cables is disconnected
  - can’t reach in to reconnect -> follow up on Monday

INTT (no report)

MVTX (Cameron)
- yesterday worked on interlock and sense cables for bias
  - RG45 connectors, can’t lock, intermittent signals,  bias interlocked
    - ordered RG45 barrels, arrived today, will work on fixing this in time for Monday
- work on cooling system
  - bypass to flush out air
  - loose connection on replacement chiller air line

sEPD (no report)

DAQ (Martin)
- daq01 disk replacement upcoming
- solution for full remote control rcdaq (see slides on indico)
- same for GTM interaction  (see slides on indico)

Magnet (no report)

Gas/cooling water (no report)

Plan of the day
- DAQ development
- subsystem testing

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------



_______________________________________________
Sphenix-run-l mailing list
Sphenix-run-l AT lists.bnl.gov
https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_sphenix-2Drun-2Dl&d=DwICAg&c=dTXc8cCP8suVpClwB1HRHQACHN4UFMgL7MtSjCbKyts&r=VpzLtnjcGB03vfJuG_p478bcDf7zDOFn2OeUM-jusdY&m=9i2YUqljNP55R0yvqQOFFqw5X4suIZ-Eznf5SUjAdUkpN_BBdCgXCLUC5q8_mzNg&s=vkUZrF0R06pA5k9fsSMKIYaP4pmmnx2n-x-FmlPL5Mw&e=



  • [Sphenix-run-l] Minutes shift change 2023-04-22, Stefan Bathe, 04/22/2023

Archive powered by MHonArc 2.6.24.

Top of Page