Minutes shift change 2023-04-23

general
—————
safety walk through at 1:00pm tomorrow:  be safe!
Tidying rack room would be appreciated

evening:  Cameron
- TPOT gas gauge was stuck:  -> tap dial!
- TPC waiting for formal approval from Rob P that interlocks are enabled
- EMCal testing, MVTX testing

night:  Charles
- only HCal and EMCal were on
- daq issue with HCal data taking, should be resolved by Martin now
- watched air handlers for IR
  - input supply had spiked at 90 degrees, called Joel:  only worry if IR temperature goes above 75 F
- Kevin worked on 1W2 (TPC laser), generated warnings

day:  Sean
- 1W2 work (Kevin)
- techs working on chilled water lines
- cable pull outdoors for SMD detector in tunnel
- John H in, Martin remotely
- one alarm with MVTX chilled water

MBD (Mickey)
- regarding issue with no clock out of the clockmaster FEMs
  - heard back from Chi; will test on Monday if that’s sufficient information to fix; otherwise will have to wait until 26th to solve
- may be able to test Lvl1 trigger in the meantime

HCal (Hanpu)
- after bias had been on all shift, two MPOD modules (but not all channels in them) tripped while taking data; recovered at first try, cause not clear
- data taking stuck when trying to take more data
- Martin advises to try taking data now
- Sean:  HCal LV fluctuating much more than EMCal -> follow up with Steve on Monday

EMCal (Sean)
- nothing much new for EMCal 

TPOT (no report)

TPC (John K, Jin)
- waiting for interlock approval (see above)
- on and off software and firmware development
- don’t expect to run TPC LV today
- Cameron will recycle chillers

INTT (no report)

MVTX (Cameron)
- was able to bring up cooling up quicker than expected
- significant drop in detector cooling, air locked, fixed by Cameron, remote system test may continue
  - no alarm generated by low flow rate
  - Cameron will specify in standing orders what shift crews should check 

sEPD (no report)

DAQ (Martin)
Martin:  GTM work, added in GUI: entire status in one call
happening after 5-6 minutes, bias had been on the whole shift before

Magnet (Kin)
- nothing new

Gas/cooling water ()
- nothing else

Plan of the day
- DAQ development
- subsystem testing

---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------



_______________________________________________
Sphenix-run-l mailing list
Sphenix-run-l AT lists.bnl.gov
https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_sphenix-2Drun-2Dl&d=DwICAg&c=dTXc8cCP8suVpClwB1HRHQACHN4UFMgL7MtSjCbKyts&r=VpzLtnjcGB03vfJuG_p478bcDf7zDOFn2OeUM-jusdY&m=9i2YUqljNP55R0yvqQOFFqw5X4suIZ-Eznf5SUjAdUkpN_BBdCgXCLUC5q8_mzNg&s=vkUZrF0R06pA5k9fsSMKIYaP4pmmnx2n-x-FmlPL5Mw&e=


---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------