star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
- From: Yi Yang <yiyang AT ncku.edu.tw>
- To: 董家宁 <jndong AT sdu.edu.cn>
- Cc: star-fst-l AT lists.bnl.gov
- Subject: Re: [Star-fst-l] Weekly FST meeting - 2/21/2019
- Date: Thu, 21 Feb 2019 23:01:36 +0800
Dear all,
Please find the meeting minutes in the following and please let me know if I missed anything.
News
- No news.
Sensor
- NDL: Li finished the preliminary test on the first batch of the sensor. The results are expected.
Yi will check the status of the second batch with NDL.
- Hamamatsu: The updated purchase order just submitted yesterday (change the testing requirement from 40 mum to 60 mum).
Mechanical structure
- 3D printing prototype will be finished next Monday.
- The design of the first "real" prototype will be finalized in these two days and the company will provide the quotation tomorrow (2/22). The production will be started soon.
- The SolidWorks files were successfully transformed into the GDML format. Te-Chuan will contact Jason for the next step.
- Need to arrange a meeting with Rahul for the limitation on the STAR structure.
T-board, Hybrid
- Jianing presented the connector selection, Nicomatic is preferred. Yi and Han-Sheng will check whether this can be fitted into the current mechanical structure and we need to get the comments/confirmation from Gerard. The decision should be made soon (next week).
- Jianing has modified the design of T-board with both connectors on the same side (old connector), and the size remains the same (no extra layer).
- Once the connector is decided, Jianing will update all the designs.
Simulation
- Te-Chuan just finished the analysis, and he will send out the detailed report later. Quick summary: the results with tighter cut on the hits requirement have better charge misidentification rate 1% vs 2% (with out hits requirement). But the momentum resolution and efficiency are about the same.
- Te-Chuan also finished the comparison between different configurations (only sTGC, 1 FST + sTGC, 2 FST + sTGC and 3 FST + sTGC). The efficiencies are similar, but the momentum resolution is much better in the 3 FST + sTGC. Detailed results will be presented in his report, too.
- Te-Chuan will also perform the Hijing simulations.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Assistant Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Assistant Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Thu, Feb 21, 2019 at 9:26 PM 董家宁 <jndong AT sdu.edu.cn> wrote:
Dear All,
I'd like to show some updates about the connector selection, you can find the slides below:
https://drupal.star.bnl.gov/STAR/system/files/Connector_selection_update_190221.pdf
See you in the talk.
Best regards,
Jianing & Li
-----原始邮件-----_______________________________________________
发件人:"Yi Yang" <yiyang AT ncku.edu.tw>
发送时间:2019-02-21 20:48:05 (星期四)
收件人: star-fst-l AT lists.bnl.gov
抄送:
主题: [Star-fst-l] Weekly FST meeting - 2/21/2019
Dear all,
Sorry for the last minute reminder. We will have our regular meeting at 9 am BNL time (today!).Since I can't create the meeting page, so please send the report/link to the list.Bluejeans meeting information:
Meeting URL https://bluejeans.com/101020434
Meeting ID 101 020 434
Dial one of the following numbers:+1.888.240.2560 (US Toll Free)
Talk to you soon.
Cheers,Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Assistant Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting - 2/21/2019,
Yi Yang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
董家宁, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Yi Yang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Aschenauer Elke-Caroline, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Te-Chuan Huang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Yi Yang, 02/21/2019
- Re: [Star-fst-l] Weekly FST meeting - 2/21/2019, Ye, Zhenyu, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Te-Chuan Huang, 02/21/2019
- Re: [Star-fst-l] Weekly FST meeting - 2/21/2019, Te-Chuan Huang, 02/21/2019
- Re: [Star-fst-l] Weekly FST meeting - 2/21/2019, Aschenauer Elke-Caroline, 02/24/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Yi Yang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Te-Chuan Huang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Aschenauer Elke-Caroline, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
Yi Yang, 02/21/2019
-
Re: [Star-fst-l] Weekly FST meeting - 2/21/2019,
董家宁, 02/21/2019
Archive powered by MHonArc 2.6.24.