Hi Gerard and all,
We have a look over the mechanical structure and the hybrid (v2.2). We believe the current design should be fine.
Please find some pictures in the following link: STAR_FST_MS_Pic_20191108.pdf
Our T-board doesn't have the male connector on it, but the space should be sufficient.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, Nov 6, 2019 at 10:22 AM Gerard Visser <gvisser AT indiana.edu> wrote:
Hi Zhenyu,
I'll try to look over all the various things I was supposed to have looked over
by the time of the meeting.
In meanwhile, let me again ask if possible we can see a few pictures
documenting that things really fit w/ the hybrid to T-board connectors when
mounted (or simulated mounted) on the mechanical structure, I think this would
be wise we see this before the v2.2 hybrid production. Of course if it is
impossible to check this at this time deciding to proceed anyway may be necessary.
Similarly I think it would be advisable we get pedestals out of one of the
existing hybrids if possible before ordering v2.2, but if that is infeasible I
guess it is a small risk.
Gerard
On 11/5/2019 8:27 PM, Ye, Zhenyu wrote:
> Dear all,
>
> We will have a weekly FST meeting this Thursday 9am BNL time. The meeting agenda and bluejeans info can be found at
> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
>
> 1. Hybrid, T-board, Inner Signal Cable - Jianing, Gerard, Mike
> 2. Mechanical structure - Yi, Han-Sheng
> 3. Module Assembly at Fermilab - Zhenyu
> 4. BNL Test stand - Prithwish, Hu
> 5. Simulation - Te-Chuan, Krishan
>
> I think we have to discuss any remaining issue if any and decide on the v2.2 hybrid production, which may delay the whole project. We should also hear the status of mechanical structure from Yi. If there is anything else to report/discuss, please let me know.
>
> Best
> Zhenyu
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting - 11/7/2019,
Ye, Zhenyu, 11/05/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/05/2019
- Re: [Star-fst-l] Weekly FST meeting - 11/7/2019, Ye, Zhenyu, 11/05/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Ye, Zhenyu, 11/05/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/05/2019
- Re: [Star-fst-l] Weekly FST meeting - 11/7/2019, Ye, Zhenyu, 11/06/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/05/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Yi Yang, 11/08/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/08/2019
- Re: [Star-fst-l] Weekly FST meeting - 11/7/2019, Zhenyu Ye, 11/12/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/08/2019
- Re: [Star-fst-l] Weekly FST meeting - 11/7/2019, Ye, Zhenyu, 11/07/2019
- <Possible follow-up(s)>
- Re: [Star-fst-l] Weekly FST meeting - 11/7/2019, Prithwish Tribedy, 11/05/2019
-
Re: [Star-fst-l] Weekly FST meeting - 11/7/2019,
Gerard Visser, 11/05/2019
Archive powered by MHonArc 2.6.24.