[Star-fst-l] Weekly FST meeting, May 18 9am (BNL time)
- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: [Star-fst-l] Weekly FST meeting, May 18 9am (BNL time)
- Date: Sat, 16 May 2020 12:25:34 +0000
Dear all,
We will have the Weekly FST meeting on Monday starting at 9am EST (BNL local
time).
Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434
https://drupal.star.bnl.gov/STAR/event/2020/05/18/star-forward-silicon-tracker-meeting
Tentative meeting agenda:
0. follow-ups on the action items from last week (see *** below)
1. Integration
by Rahul Sharma/Felix Archampong
2. Hybrid
by Maowu Nie, Jianing Dong
2. Mechanical structure by Yi
Yang
3. Prototype Module Assembly and Test by Xu Sun
4. Tracking Studies by
Krishan Gopal, Daniel Brandenburg
5. Simulation Studies by
Shenghui Zhang
*** Action items from previous weeks ***
1) Integration: send an email with detailed questions to the list to collect
information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto MS for Plan
A at NTU - Yi/Han-Sheng
3) Document the procedure and requirements of gluing hybrids onto MS for Plan
B by AIDC. This is needed before new hybrid production - Yi/Han-Sheng
4) Document on how/where the company would measure the surface flatness and
being parallel between inner-outer sectors, before and after glueing hybrids
and inner-outer sectors together - Yi/Han-Sheng
5) Look into radiation tolerance test of soft cooling tubes at
BNL/STAR/Taiwan - Flemming/Yi
6) Measuring hybrid flatness, thickness and dimensions - Maowu/Jianing
7) UIC send a T-board and cable to NCKU to check if there is any conflict
with the MS - Zhenyu
8) Looking into alternative clustering algorithm to improve matching
efficiency - Xu
9) Tune the timing setting for ADC sampling - Gerard/Xu
10) Studying the tracking performance by varying the Z-locations of FST
disks, and number of r/phi segments - Krishan/Daniel
11) Looking into FST simulation and track reconstruction to compare 300 vs
500 micron thick sensors - Shenghui
Best,
Zhenyu
-
[Star-fst-l] Weekly FST meeting, May 18 9am (BNL time),
Ye, Zhenyu, 05/16/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 18 9am (BNL time),
videbaek, 05/17/2020
- Re: [Star-fst-l] Weekly FST meeting, May 18 9am (BNL time), Yi Yang, 05/18/2020
- Re: [Star-fst-l] Weekly FST meeting, May 18 9am (BNL time), Ye, Zhenyu, 05/18/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 18 9am (BNL time),
videbaek, 05/17/2020
Archive powered by MHonArc 2.6.24.