Hi Zhenyu and all,
Please find the details of the four hybrids below:
https://drupal.star.bnl.gov/STAR/blog/nie/measurements-hybrid
The items of the hybrids include: flatness, thickness, pad location test, outline test and chip location test.
Generally speaking, the measurements are quite consistent with the CAD values. But we also find the outer hybrid from the old vendor, the pad location and chip location have large deviation(~1 mm) from the designed values. We further asked the company to double check their results, and they confirmed the measurements was correct.
For the two reference holes A and B, the information can be found below:
Inner: A(0,0) B(68.428, -1.498) AB = 68.44 mm
Outer: A(0,0) B(117.374, 0.762) AB = 117.38 mm
Hope it helps,
Thanks,
Maowu & Jianing
在 2020-05-26 01:43,Ye, Zhenyu 写道:
Felix, Krishan, Han-Sheng, Maowu, Pu-Kai, Shenghui, Te-Chuan, Xu, Yi, Zhenyu
1. Follow-up on action items from previous weeks
1) Integration: send an email with detailed questions to the list to
collect information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto MS
for Plan A at NTU - Yi/Han-Sheng
-> the procedure is almost determined. will have the document ready next week
3) Look into radiation tolerance test of soft cooling tubes at
STAR/Taiwan - Flemming/Yi
-> tubes are being exposed to radiation. The total doses would be 1x
and 5x of the ones in the proposal. Will repeat the measurement with
NOVEC at NCKU after radiation.
4) Measuring hybrid flatness, thickness and dimensions - Maowu/Jianing
-> see below
5)) UIC send a T-board and cable to NCKU to check if there is any
conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improve matching
efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xu
-> see below
8) Studying the tracking performance by varying the Z-locations of FST
disks, and number of r/phi segments - Daniel/Krishan
-> see below
9) Looking into FST simulation and track reconstruction to compare 300
vs 500 micron thick sensors - Shenghui
2. Integration - Felix
Working on changing the Z-locations of FST disks
3. Simulation - Krishan
Has obtained momentum resolution, but it is different than Daniel’s.
Will check with Daniel. Have results for different numbers of r- and
phi-segments.
4. Hybrid - Maowu
1) Measured the flatness of two sets of hybrids (1 from old and 1 from
new vendor). The maximum deviation of thickness is less than 18 (7)
microns for old (new) vendor.
2) Measured relative positions of bonding pads w.r.t. the center of
VIA-A, which would be used as one of the two reference points on the
hybrid when gluing the hybrid onto the mechanical structure. The
shifts from the design in the direction perpendicular to wire-bond are
between (+20, +60) microns.
* Action item - Maowu: add the absolute differences in the excel file.
Find out the design value of the distance between the two reference
VIAs on the hybrids.
* Action item - question for Yi: There are two VIAs that would be used
as reference points on the hybrid when gluing the hybrid onto the
mechanical structure. The rotation is determined by the line
connecting the centers of the two vias. Which point will be used to
determine the position of the hybrid?
5. Prototype module test - Xu
Has found and used the code to tune the setting for ADC timing for
FST. Will check with Gerard about the results
Mechanical structure - Yi
1) glued one hybrid onto MS. Good in general by eye. There are a few
places that need to improve. Will try to address them and start gluing
hybrids onto a good MS this Thursday/Friday, and glue the inner/outer
sections together.
2) Will measure the distance between the centers of the two reference
VIAs on the hybrid and compare to the design values from Maowu. Will
measure the relative positions of the two reference VIAs w.r.t. pins
in the MS.
4) Will measure the surface flatness of the MS before and after gluing
the hybrids
5) Will do electrical tests after the connector is soldered onto the
hybrid. Zhenyu recommends to do it after plugging and unplugging the
male connectors to make sure the soldering is robust. Yi is not sure
if he has male connectors. Maowu will check if SDU has male connectors
and if so send to Yi
*** Action items ***
1) Integration: send an email with detailed questions to the list to
collect information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto MS
for Plan A at NTU - Yi/Han-Sheng
3) Look into radiation tolerance test of soft cooling tubes at
STAR/Taiwan - Flemming/Yi
4) Measuring hybrid flatness, thickness and dimensions - Maowu/Jianing
5)) UIC send a T-board and cable to NCKU to check if there is any
conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improve matching
efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xu
8) Studying the tracking performance by varying the Z-locations of FST
disks, and number of r/phi segments - Daniel/Krishan
9) Looking into FST simulation and track reconstruction to compare 300
vs 500 micron thick sensors - Shenghui
On May 21, 2020, at 10:07 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
Dear all,
We will have the Weekly FST meeting on Monday starting at 9am EST (BNL local time).
Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434
https://drupal.star.bnl.gov/STAR/event/2020/05/25/star-forward-silicon-tracker-meeting
Tentative meeting agenda:
0. follow-ups on the action items from last week (see *** below)
1. Testing Prototype at STAR During Shutdown by Flemming Videbaek
2. Tracking Studies by Daniel Brandenburg, Krishan Gopal
3. Integration
by Rahul Sharma, Felix Archampong
4. Hybrid
by Maowu Nie, Jianing Dong
5. Mechanical structure by Yi Yang
6. Prototype Module Test by Xu Sun
7. Simulation Studies by Shenghui Zhang
*** Action items from previous weeks ***
1) Integration: send an email with detailed questions to the list to collect information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto MS for Plan A at NTU - Yi/Han-Sheng
3) Look into radiation tolerance test of soft cooling tubes at STAR/Taiwan - Flemming/Yi
4) Measuring hybrid flatness, thickness and dimensions - Maowu/Jianing
5)) UIC send a T-board and cable to NCKU to check if there is any conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improve matching efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xu
8) Studying the tracking performance by varying the Z-locations of FST disks, and number of r/phi segments - Daniel/Krishan
9) Looking into FST simulation and track reconstruction to compare 300 vs 500 micron thick sensors - Shenghui
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Ye, Zhenyu, 05/21/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Aschenauer Elke-Caroline, 05/21/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Ye, Zhenyu, 05/21/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Ye, Zhenyu, 05/25/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/26/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Capotosto, Michael, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/28/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Yi Yang, 05/28/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/28/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Capotosto, Michael, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/27/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/26/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Aschenauer Elke-Caroline, 05/21/2020
Archive powered by MHonArc 2.6.24.