Hi Yi,
We just sent two female connectors for T-board to you. The DHL tracking number is 1135665226.
Regards,
Maowu & Jianing
在 2020-05-28 09:21,Yi Yang 写道:
Dear Mike,
Sorry for the delayed reply and thanks a lot for offering to send them
to us.
I think we can wait for one or two days and see the status of
Jianing's shipment. If it really got stuck at customs, I will let you
know.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang [4]
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, May 27, 2020 at 7:05 PM Capotosto, Michael <capotosto AT bnl.gov>
wrote:
Hey Yi, Zhenyu,https://drupal.star.bnl.gov/STAR/event/2020/05/25/star-forward-silicon-tracker-meeting
I do believe that we have a handful of spare male connectors from
the V2.1 T-Boards at BNL (I believe these just have a different
jackscrew/captive screw). Would these work for your tests? I have to
head in to the lab today, if you’d like I can package and drop off
a few of these with shipping and receiving. I’m not sure if
they’d reach you any quicker.
--Mike Capotosto
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Yi
Yang
Sent: Tuesday, May 26, 2020 11:59 PM
To: Ye, Zhenyu <yezhenyu AT uic.edu>
Cc: star-fst-l AT lists.bnl.gov
Subject: Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time)
Hi Zhenyu,
Regarding the "5) Will do electrical tests after the connector is
soldered onto the hybrid. Zhenyu recommends to do it after plugging
and unplugging the male connectors to make sure the soldering is
robust. Yi is not sure if he has male connectors. Maowu will check
if SDU has male connectors and if so send to Yi"
Two sets of hybrids are passed the electrical tests today.
Jianing confirmed that I did send all my male connectors to her
before and she is going to send 2 connectors to me today.
However, it might take several days to weeks to receive them (I am
not 100% sure whether we will have to wait for 14 days to receive
the package from China now). And we are planning to mount the
connector on the MS in the end of this week.
So, I would propose to skip the plugging and unplugging test for
these prototypes since I think you want to test the inner sensor
asap. What do you think?
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang [3]
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Tue, May 26, 2020 at 1:43 AM Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
Felix, Krishan, Han-Sheng, Maowu, Pu-Kai, Shenghui, Te-Chuan, Xu,
Yi, Zhenyu
1. Follow-up on action items from previous weeks
1) Integration: send an email with detailed questions to the list
to collect information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto
MS for Plan A at NTU - Yi/Han-Sheng
-> the procedure is almost determined. will have the document
ready next week
3) Look into radiation tolerance test of soft cooling tubes at
STAR/Taiwan - Flemming/Yi
-> tubes are being exposed to radiation. The total doses would be
1x and 5x of the ones in the proposal. Will repeat the measurement
with NOVEC at NCKU after radiation.
4) Measuring hybrid flatness, thickness and dimensions -
Maowu/Jianing
-> see below
5)) UIC send a T-board and cable to NCKU to check if there is any
conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improve
matching efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xu
-> see below
8) Studying the tracking performance by varying the Z-locations of
FST disks, and number of r/phi segments - Daniel/Krishan
-> see below
9) Looking into FST simulation and track reconstruction to compare
300 vs 500 micron thick sensors - Shenghui
2. Integration - Felix
Working on changing the Z-locations of FST disks
3. Simulation - Krishan
Has obtained momentum resolution, but it is different than
Daniel’s. Will check with Daniel. Have results for different
numbers of r- and phi-segments.
4. Hybrid - Maowu
1) Measured the flatness of two sets of hybrids (1 from old and 1
from new vendor). The maximum deviation of thickness is less than
18 (7) microns for old (new) vendor.
2) Measured relative positions of bonding pads w.r.t. the center
of VIA-A, which would be used as one of the two reference points
on the hybrid when gluing the hybrid onto the mechanical
structure. The shifts from the design in the direction
perpendicular to wire-bond are between (+20, +60) microns.
* Action item - Maowu: add the absolute differences in the excel
file. Find out the design value of the distance between the two
reference VIAs on the hybrids.
* Action item - question for Yi: There are two VIAs that would be
used as reference points on the hybrid when gluing the hybrid onto
the mechanical structure. The rotation is determined by the line
connecting the centers of the two vias. Which point will be used
to determine the position of the hybrid?
5. Prototype module test - Xu
Has found and used the code to tune the setting for ADC timing for
FST. Will check with Gerard about the results
Mechanical structure - Yi
1) glued one hybrid onto MS. Good in general by eye. There are a
few places that need to improve. Will try to address them and
start gluing hybrids onto a good MS this Thursday/Friday, and glue
the inner/outer sections together.
2) Will measure the distance between the centers of the two
reference VIAs on the hybrid and compare to the design values from
Maowu. Will measure the relative positions of the two reference
VIAs w.r.t. pins in the MS.
4) Will measure the surface flatness of the MS before and after
gluing the hybrids
5) Will do electrical tests after the connector is soldered onto
the hybrid. Zhenyu recommends to do it after plugging and
unplugging the male connectors to make sure the soldering is
robust. Yi is not sure if he has male connectors. Maowu will check
if SDU has male connectors and if so send to Yi
*** Action items ***
1) Integration: send an email with detailed questions to the list
to collect information - Rahul/Felix
2) Document the procedure and requirements of gluing hybrids onto
MS for Plan A at NTU - Yi/Han-Sheng
3) Look into radiation tolerance test of soft cooling tubes at
STAR/Taiwan - Flemming/Yi
4) Measuring hybrid flatness, thickness and dimensions -
Maowu/Jianing
5)) UIC send a T-board and cable to NCKU to check if there is any
conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improve
matching efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xu
8) Studying the tracking performance by varying the Z-locations of
FST disks, and number of r/phi segments - Daniel/Krishan
9) Looking into FST simulation and track reconstruction to compare
300 vs 500 micron thick sensors - Shenghui
On May 21, 2020, at 10:07 PM, Ye, Zhenyu <yezhenyu AT uic.edu>wrote:
EST (BNL local time).
Dear all,
We will have the Weekly FST meeting on Monday starting at 9am
Bluejeans Meeting URL https://bluejeans.com/101020434 [1]
Meeting ID: 101 020 434
[2]
Flemming Videbaek
Tentative meeting agenda:
0. follow-ups on the action items from last week (see *** below)
1. Testing Prototype at STAR During Shutdown by
2. Tracking Studiesby Daniel Brandenburg, Krishan Gopal
3. Integrationby Rahul Sharma, Felix Archampong
4. Hybridby Maowu Nie, Jianing Dong
5. Mechanical structureby Yi Yang
6. Prototype Module Testby Xu Sun
7. Simulation Studiesby Shenghui Zhang
list to collect information - Rahul/Felix
*** Action items from previous weeks ***
1) Integration: send an email with detailed questions to the
2) Document the procedure and requirements of gluing hybridsonto MS for Plan A at NTU - Yi/Han-Sheng
3) Look into radiation tolerance test of soft cooling tubes atSTAR/Taiwan - Flemming/Yi
4) Measuring hybrid flatness, thickness and dimensions -Maowu/Jianing
5)) UIC send a T-board and cable to NCKU to check if there isany conflict with the MS - Zhenyu
6) Looking into alternative clustering algorithm to improvematching efficiency - Xu
7) Tune the timing setting for ADC sampling - Gerard/Xuof FST disks, and number of r/phi segments - Daniel/Krishan
8) Studying the tracking performance by varying the Z-locations
9) Looking into FST simulation and track reconstruction tocompare 300 vs 500 micron thick sensors - Shenghui
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
Links:
------
[1] https://bluejeans.com/101020434
[2] https://drupal.star.bnl.gov/STAR/event/2020/05/25/star-forward-silicon-tracker-meeting
[3] https://urldefense.com/v3/__http:/phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!Xxy4X2D2uwYlZtNKy700r-SN4bZk8Lq_fsti-7L-iqUsp2clouGrv-IQj40Kp3V_S4xfkCo$
[4] https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!TKVc5pxbO31n6RDpiwIXouXYoZ-hSq721kiCsvMzjFgSHDeaWR8ZfwgUnelsEU_pfIHhQRU$
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Ye, Zhenyu, 05/21/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Aschenauer Elke-Caroline, 05/21/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Ye, Zhenyu, 05/21/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Ye, Zhenyu, 05/25/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/26/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Capotosto, Michael, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/28/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Yi Yang, 05/28/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/28/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Capotosto, Michael, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
nie, 05/27/2020
- Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time), Yi Yang, 05/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Yi Yang, 05/26/2020
-
Re: [Star-fst-l] Weekly FST meeting, May 25 9am (BNL time),
Aschenauer Elke-Caroline, 05/21/2020
Archive powered by MHonArc 2.6.24.