Hi all,

The cooling test is performed seperately for the integration test as discussed a long time ago.
Te IST/FST cooling system is currently setup in the assembly building. The plan is after the integration test to bring the dark box to the assembly building on a chart at the cooling unit.
It will be connected to the cooling unit manifolds

Rahul/Bill will check if we have longer ~5 ft cooling tubes available for this.Will order if not available right now.
Xu make us aware that the one cooling connector is very close to the edge of the holding box.
Hopefully the tubes ar flexible enough to connect.
The cooling tubes must be grounded as pointed out several times.Yi do you have the information on clips that are suitable?
The control of the wedge/module will be made via the (a) long grey cable +PPB and the MPOD crate + computer should be setup in the Assembly building. As the cabl is long there is lost of flexibility where to put this.
It should be possible to run this w/o needing connection to the local network.
Prithwich and Yu should confirm this with a lab test before setting up in the hall.
The local temp from the APV should be readout and recorded.

Rahul will like to complete the test in the next two weeks, so the cooling unit can be installed
on the North platform lower level before closseout.

best Flemming





--
Flemming Videbaek
senior scientist
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973

phone: 631-344-4106
cell : 631-681-1596




Archive powered by MHonArc 2.6.24.

Top of Page