Hi Flemming

Clips suggested by Gerard:

https://urldefense.com/v3/__https://www.mouser.com/ProductDetail/littelfuse/01220087z/?qs=w4dvuIu98YnZE2lfMuQ4ow*3D*3D&countrycode=US&currencycode=USD__;JSU!!P4SdNyxKAPE!UXBbhWMiYpqwLr34j3yGwDMPiRX-LpbpsBXd76u_Xn3lcFdtaINyhrnqTiTbVj0XE06Tkjs$


As pointed out also by Gerard, the temp sensors on the hybrids do not reflect
the actual temperatures of the APVs.
Will you be able to get a thermal camera to measure the temperature of the
APVs more directly?

Zhenyu

> On Nov 30, 2020, at 2:53 PM, videbaek <videbaek AT bnl.gov> wrote:
>
>
> Hi all,
>
> The cooling test is performed seperately for the integration test as
> discussed a long time ago.
> Te IST/FST cooling system is currently setup in the assembly building. The
> plan is after the integration test to bring the dark box to the assembly
> building on a chart at the cooling unit.
> It will be connected to the cooling unit manifolds
>
> Rahul/Bill will check if we have longer ~5 ft cooling tubes available for
> this.Will order if not available right now.
> Xu make us aware that the one cooling connector is very close to the edge
> of the holding box.
> Hopefully the tubes ar flexible enough to connect.
> The cooling tubes must be grounded as pointed out several times.Yi do you
> have the information on clips that are suitable?
> The control of the wedge/module will be made via the (a) long grey cable
> +PPB and the MPOD crate + computer should be setup in the Assembly
> building. As the cabl is long there is lost of flexibility where to put
> this.
> It should be possible to run this w/o needing connection to the local
> network.
> Prithwich and Yu should confirm this with a lab test before setting up in
> the hall.
> The local temp from the APV should be readout and recorded.
>
> Rahul will like to complete the test in the next two weeks, so the cooling
> unit can be installed
> on the North platform lower level before closseout.
>
> best Flemming
>
>
>
>
>
> --
> Flemming Videbaek
> senior scientist
> videbaek @ bnl.gov
> Brookhaven National Lab
> Physics Department
> Bldg 510D
> Upton, NY 11973
>
> phone: 631-344-4106
> cell : 631-681-1596
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://urldefense.com/v3/__https://nam04.safelinks.protection.outlook.com/?url=https*3A*2F*2Flists.bnl.gov*2Fmailman*2Flistinfo*2Fstar-fst-l&amp;data=04*7C01*7Cyezhenyu*40uic.edu*7C01204473064942e3549808d895720fd3*7Ce202cd477a564baa99e3e3b71a7c77dd*7C0*7C0*7C637423664411136585*7CUnknown*7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0*3D*7C1000&amp;sdata=M1x7b*2B*2BROs1hVvbwx8cFASOd5Ff*2Bp7AFCzX7savBQq0*3D&amp;reserved=0__;JSUlJSUlJSUlJSUlJSUlJSUlJSUlJQ!!P4SdNyxKAPE!UXBbhWMiYpqwLr34j3yGwDMPiRX-LpbpsBXd76u_Xn3lcFdtaINyhrnqTiTbVj0XOTXCi2A$
>