  • From: Michael Tuts <tuts AT pmtuts.net>
  • To: Hal Evans <hgevans AT indiana.edu>, "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] scope contingency/opportunity
  • Date: Wed, 17 Jul 2019 13:39:38 +0000

Hi Hal,
Can you resend the spreadsheet? (or is it posted?)
Thanks, Mike

-----Original Message-----
From: Hal Evans <hgevans AT indiana.edu>
Sent: Wednesday, July 17, 2019 7:50 AM
To: Michael Tuts <tuts AT pmtuts.net>;
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] scope contingency/opportunity

Thanks Mike!

I had a cut-and-paste error for the Muon and LAr dates. That's been corrected
now.

I took the Trigger numbers from the version of the PEP posted in docdb.
Elliot told me that these were still the best numbers to use - but perhaps he
was referring to what was sent recently to you. I've changed the spreadsheet
accordingly.

Also - Elliot sent me some physics costs of the HTT reduction, which I've
incorporated into the Impact column. (Thanks Elliot!).

I'm still waiting for input from Muons on this. Once I get that I'll upload
the spreadsheet to docdb.

Cheers  -  Hal

On 7/16/19 6:55 PM, Michael Tuts wrote:
> Hi Hal,
>
> I looking at your sheet when updating the info for the PEP, I think there
> are a number of date errors?
>
> Descoping tab:
>
> * What I had previously updated when I asked the L2s to update the PEP was
> for Muon dates for reducing sMDTs of 12/2021, 5/2022, 9/2022, 1/2023 vs
> what you show as 12/2019, 5/2019(!), 9/2019(!), 1/2019(!). The other Muon
> dates are also clearly wrong 6/2019 and 3/2019.
> * Is the LAr decision date really 9/2019?
> * Elliot has supplied me with $1,600 cost for 2/3 TP + 1/3 RTM + 5/6
> TFM -- you have a different cost and a different number of RTM boards
> (2/3) , so I am wondering which is correct
> * Also he gave me $1,300 cost for 1/3 TP + 0 RTM + 2/3 TFM vs yours which
> shows 1/3 TP + 1/3 RTM + 2/3 TFM -- which is correct?
>
> Cheers, Mike
>
> -----Original Message-----
> From: Usatlas-hllhc-l2deputymgmt-nsf-l
> <usatlas-hllhc-l2deputymgmt-nsf-l-bounces AT lists.bnl.gov> On Behalf Of
> Hal Evans
> Sent: Tuesday, July 16, 2019 9:21 AM
> To: Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
> Subject: [Usatlas-hllhc-l2deputymgmt-nsf-l] scope
> contingency/opportunity
>
> Hi all,
>
> I've compiled all of your scope contingency/opportunity numbers into the
> attached table. I made a few minor modifications.
>
> 1. Trigger: I included an additional Trigger Opportunity - updating the
> gFEX algorithms for Phase-2.
>
> 2. Opportunity Dates: some of these were given only at the granularity of a
> year. I updated those to MMM-YY format, choosing a date arbitrarily.
>
> Please have a look and let me know if I've made any mistakes.
>
> Having this all compiled together highlights the fact that we are very thin
> on Physics impact/motivation for the contingency/opportunities. I realize
> that this will be difficult, but we should really include some sort of
> discussion of how these decisions could affect ATLAS physics.
> This can be hand-wavy (but obviously the more quantitative the better).
> The point is to demonstrate that we've thought about this NSF requirement
> for scope contingency/opportunity.
>
> Please try to get me some input on this by Thursday.
>
> Thanks  -  Hal
>
> --
> ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v
> Hal Evans hgevans AT indiana.edu
>
> https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=49gTTyvVBnKd4JHf2bt3xiChfuWQepSFBd7zL7jIRNs&s=j1948e9ANvzfc-_oDaKNVLPoNi3XU9wJdj48WpRgsjM&e=
> Tel: (812)856-3828 Fax: (812)855-5533
> 253 Swain Hall West Indiana University
> 727 E. Third St. Bloomington, IN 47405
> v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^
>
--
^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v
Hal Evans hgevans AT indiana.edu

https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIGaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=ldCSAfNZvilKOq_P6pJX2yKz_E9CzAO2-zc1zvAFxLs&s=zwZpI69C_BIii5cAQwDnl0805molE6GxfvsFR7tQ0sw&e=

Tel: (812)856-3828 Fax: (812)855-5533
253 Swain Hall West Indiana University
727 E. Third St. Bloomington, IN 47405
v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^





Archive powered by MHonArc 2.6.24.

Top of Page