usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity
- From: Hal Evans <hgevans AT indiana.edu>
- To: Elliot Lipeles <lipeles AT hep.upenn.edu>
- Cc: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity
- Date: Tue, 23 Jul 2019 14:31:10 -0400
Hi Elliot, Here is what you sent us about the L1Track scope opportunity estimate on 1/11/2019: 2) Participate in L1Track Is this still your best estimate? Thanks - Hal On 7/23/19 1:01 PM, Elliot Lipeles
wrote:
Hi Hal and Michael,
I don't recall making up the number for L1Track... and more
importantly what do we assume it includes...
I would guess that it should be related to the NSF scope
-- L1Track Hardware + firmware
-- ~50% TPs --> ~$1M (assuming ~1/3 of AMTPs moved
to L1Track, because rHTT not needed with L1Track)
-- firmware??? - no model here but maybe half of the
planned firmware for the baseline --> $1M
-- Global algorithm framework modifications
-- again no model, but maybe half the firmware frame
work labor $700k
-- Global algorithms
-- this could be part of the existing algorithm
opportunity.
Of course, on the DoE side there would be additional work:
-- very different MUX firmware
-- low-level firmware in GEP
-- CTP interface firmware
Elliot
On Tue, Jul 23, 2019 at 11:49
AM Hal Evans <hgevans AT indiana.edu> wrote:
Thanks Michael, Comments below. - Hal On
7/23/19 11:38 AM, Begel, Michael wrote:
Will fix this... Elliot should comment here. I must admit that I've forgotten. Yes: there are a couple of issues here that reduce the priority. One is that this needs to be decided relatively early. Also, if it's not available on day one, L0Muon as a whole does not go down in flames. No - what is quoted is the additional savings that would be realized after the first option is exercised.
On Tue, Jul 23, 2019
at 11:22 AM Hal Evans <hgevans AT indiana.edu>
wrote:
Dear L2Ms/DL2Ms,Please find attached an updated version of the scope contingency/opportunity spreadsheet. After reading over the recommendations from PDR about this topic, we realized that we have been asked to provide a prioritization for our contingency/opportunity items. Clearly, any prioritization that we apply now will change in the future as the realities of the situation at ATLAS evolve. So you should not take this too seriously. However, since we're required to do it, here's an attempt. The basic criteria we applied in producing the prioritization are: 1. Scope Contingency: give highest priority (i.e. these options would be exercised first) to those items that could conceivably be recovered later. 2. Scope Opportunity: give highest priority to those items that will need to be done, but for which no plan currently exists. 3. Exact rankings within those criteria are largely random, and in any case these ranking do not indicate how we would actually cut/add scope should the need/opportunity arise. That will depend on the exact situation at the time the decision needs to be made. Let me know if you have any questions or comments. I'll post the new version tomorrow unless there are strong objections. Others in the PO should chime in if there's anything important I've left out. Cheers - Hal -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=F71kkH52FGCfYiLTi0jcjV7qzsasxBh1kXBWBtnBmOw&s=pgLOLjYmoJEQsp97RmbHu9H4Y487H4U3JOJAnzm0_L8&e= Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ _______________________________________________ Usatlas-hllhc-l2deputymgmt-nsf-l mailing list Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ Usatlas-hllhc-l2deputymgmt-nsf-l mailing list Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ |
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Zhang, Jinlong, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Begel, Michael, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
Archive powered by MHonArc 2.6.24.