Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity
- From: Hal Evans <hgevans AT indiana.edu>
- To: "Begel, Michael" <begel AT bnl.gov>, "Lipeles, Elliot" <lipeles AT hep.upenn.edu>
- Cc: "Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity
- Date: Tue, 23 Jul 2019 14:33:11 -0400
Yes - this is why HTT is high in the scope contingency priority.
- Hal On 7/23/19 1:39 PM, Begel, Michael
wrote:
So, to summarize, for a savings of $1.7M we'd lose
5% of our HH->bbbb acceptance. For an additional savings of
$1.6M, we'd lose another 5% acceptance.
For reference, what fraction of the total NSF HTT cost is
the $3.2M?
Michael Begel
begel AT bnl.gov
On Tue, Jul 23, 2019 at 12:28
PM Elliot Lipeles <lipeles AT hep.upenn.edu> wrote:
10%
On Tue, Jul 23, 2019 at
12:27 PM Begel, Michael <begel AT bnl.gov>
wrote:
No - what is quoted is the additional savings that would be realized after the first option is exercise. I should have been more clear. If we
don't do both then is the impact 10% or 15% on
H->bb acceptance.
On Tue,
Jul 23, 2019 at 11:22 AM Hal Evans <hgevans AT indiana.edu>
wrote:
Dear L2Ms/DL2Ms,Please find attached an updated version of the scope contingency/opportunity spreadsheet. After reading over the recommendations from PDR about this topic, we realized that we have been asked to provide a prioritization for our contingency/opportunity items. Clearly, any prioritization that we apply now will change in the future as the realities of the situation at ATLAS evolve. So you should not take this too seriously. However, since we're required to do it, here's an attempt. The basic criteria we applied in producing the prioritization are: 1. Scope Contingency: give highest priority (i.e. these options would be exercised first) to those items that could conceivably be recovered later. 2. Scope Opportunity: give highest priority to those items that will need to be done, but for which no plan currently exists. 3. Exact rankings within those criteria are largely random, and in any case these ranking do not indicate how we would actually cut/add scope should the need/opportunity arise. That will depend on the exact situation at the time the decision needs to be made. Let me know if you have any questions or comments. I'll post the new version tomorrow unless there are strong objections. Others in the PO should chime in if there's anything important I've left out. Cheers - Hal -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=F71kkH52FGCfYiLTi0jcjV7qzsasxBh1kXBWBtnBmOw&s=pgLOLjYmoJEQsp97RmbHu9H4Y487H4U3JOJAnzm0_L8&e= Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ _______________________________________________ Usatlas-hllhc-l2deputymgmt-nsf-l mailing list Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ Usatlas-hllhc-l2deputymgmt-nsf-l mailing list Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ |
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Elliot Lipeles, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Zhang, Jinlong, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Begel, Michael, 07/23/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity, Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Hal Evans, 07/23/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] Prioritized scope contingency/opportunity,
Begel, Michael, 07/23/2019