Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1
- From: Hal Evans <hgevans AT indiana.edu>
- To: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>, Elliot Lipeles <lipeles AT hep.upenn.edu>
- Cc: Mkruse <Mkruse AT phy.duke.edu>, usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1
- Date: Wed, 11 Sep 2019 22:51:58 -0400
Hi all,
Here's an attempt at compiling the information about latest scope opportunity dates. I'm still missing information here from LAr (if the dates can't be shifted, then please just let me know).
For scope contingency, I would argue that the dates we provided are already the latest possible.
Finally, for Question 10 (the 5 major technical requirements), we've made a good start, but I suspect that George will want to see two pieces of information for each listed requirement.
1. whether it has been demonstrated completely or partially by existing prototypes
2. where in the QA/QC document its verification shows up
Most of you have answered the first of these questions, but not the second. It would be good if we could add that.
Cheers - Hal
On 9/11/19 10:02 PM, Gustaaf Brooijmans wrote:
This message was sent from a non-IU address. Please exercise caution when clicking links or opening attachments from external sources.--
-------
Hi,
Ok, let's sleep on it, and see what Hal thinks as well.
Gustaaf
On 9/11/19 9:57 PM, Elliot Lipeles wrote:
Hi Gustaaf,
I do also worry about that. If things go wrong, it could be necessary to respin, more likely problems will be that some links don't achieve the required speed, which wouldn't derail the work at the start of the MREFC.
I choose the Global because if we have 5 groups writing firmware and then the framework is changed significantly that could cause a lot of rework.
Elliot
On Wed, Sep 11, 2019 at 9:49 PM Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu <mailto:gusbroo AT nevis.columbia.edu>> wrote:
Hi Elliot,
Thanks!
Hal and I discussed the "worries" earlier and we though for trigger the
obvious one was the HTT demonstrator. It's not submitted for fab yet,
it's more complex than what the same people have built before, so it's
likely to slip. Do you not worry about that?
Best,
Gustaaf
On 9/11/19 9:33 PM, Elliot Lipeles wrote:
>
>
> Here are the text answers for trigger + slides...
>
> 1. Descope/upscope items - please provide both
preferred/scheduled and
> need-by dates...
>
> Descope HTT can be decided up to the production orders July 2023.
>
> Upscope gFEX algorithm Q4 2022
> Upscope Global algorithms Q1 2025
> Upscope L1Track could be as late as NSF allows, but if ATLAS starts
> planning to do it might need to be earlier. Not sure how that
fits in
> the earliest/latest concept.
>
> 4. please provide a rank-ordered list of remaining work packages
(in the
> pre-MREFC project) - what are you most concerned about? Please
mention
> your “plan B's”.
> Global: Delay in Specification Review (currently planned for 1st
week
> December) means framework design not approved before MREFC start.
>
> Elliot
>
>
>
>
> On Wed, Sep 11, 2019 at 9:30 PM John Parsons
<parsons AT nevis.columbia.edu <mailto:parsons AT nevis.columbia.edu>
> <mailto:parsons AT nevis.columbia.edu
<mailto:parsons AT nevis.columbia.edu>>> wrote:
>
>
> And here is LAr.
>
> John
>
>
> On 9/11/19 9:14 PM, Thomas Schwarz wrote:
> > Here's muons
> >
> > Tom
> >
> >
> >
> > ===================
> > Tom Schwarz
> > Associate Professor
> > Department of Physics
> > University of Michigan
> > Office: 734-764-8941
> > Lab: 734-763-7805
> > schwarzt AT umich.edu <mailto:schwarzt AT umich.edu>
<mailto:schwarzt AT umich.edu <mailto:schwarzt AT umich.edu>>
> <mailto:schwarzt AT umich.edu <mailto:schwarzt AT umich.edu>
<mailto:schwarzt AT umich.edu <mailto:schwarzt AT umich.edu>>>
> > ===================
> >
> >
> >
> > On Wed, Sep 11, 2019 at 9:09 PM Gustaaf Brooijmans
> > <gusbroo AT nevis.columbia.edu
<mailto:gusbroo AT nevis.columbia.edu>
<mailto:gusbroo AT nevis.columbia.edu <mailto:gusbroo AT nevis.columbia.edu>>
> <mailto:gusbroo AT nevis.columbia.edu
<mailto:gusbroo AT nevis.columbia.edu>
> <mailto:gusbroo AT nevis.columbia.edu
<mailto:gusbroo AT nevis.columbia.edu>>>> wrote:
> >
> >
> > Hello all,
> >
> > Attached is the current set. Please send your
contributions
> asap.
> >
> > Thx
> >
> > Gustaaf
> > _______________________________________________
> > Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
> > Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>>
> > <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>>>
> >
>
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
> >
> >
> > _______________________________________________
> > Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
> > Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>>
> >
>
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
> >
>
> --
> ______________________________________________________________________
>
> John Parsons
> Nevis Labs, Email: parsons AT nevis.columbia.edu
<mailto:parsons AT nevis.columbia.edu>
> <mailto:parsons AT nevis.columbia.edu
<mailto:parsons AT nevis.columbia.edu>>
> Columbia University Phone: (914) 591-2820
> P.O. Box 137 Fax: (914) 591-8120
> Irvington, NY 10533 WWW:
>
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=kT6bTziEsjfFEKe1XLVFfkOdwvvOQuajOLIa8aweK8c&s=gpCbcIS2qf8MnqVq6i8UvC2qoBRVvz3y5hBpuE5wzBU&e=
>
>
> ______________________________________________________________________
> _______________________________________________
> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
<mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>>
>
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
>
-- Gustaaf Brooijmans - Columbia University
@Columbia: (212) 854 4527; Nevis virtual phone: (914) 591 2804
Als sie mich holten,
gab es keinen mehr, der protestieren konnte.
^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v
Hal Evans hgevans AT indiana.edu
https://urldefense.proofpoint.com/v2/url?u=http-3A__pages.iu.edu_-7Ehgevans_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=Z0wuTxQYnTTMlYma4lGZlO3skeCGVBrGGurYkWbhJsJuG5HaY82rmCNSdFOV7C4Z&m=Xkd_srJkG7acdxLhBxlQNOcTYDMfEUuD76QCUBcVJIY&s=YrW_F4M6kNG8xQhGh-iMuA9Pu_VuaMNaeIqYVwn6QFE&e= Tel: (812)856-3828 Fax: (812)855-5533
253 Swain Hall West Indiana University
727 E. Third St. Bloomington, IN 47405
v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^
Attachment:
2019-09-12_Q1-2.pdf
Description: Adobe PDF document
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1
, (continued)
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Elliot Lipeles, 09/11/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Gustaaf Brooijmans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Hal Evans, 09/11/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Gustaaf Brooijmans, 09/11/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Thomas Schwarz, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, John Parsons, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Elliot Lipeles, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Gustaaf Brooijmans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Elliot Lipeles, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Gustaaf Brooijmans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Hal Evans, 09/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, John Parsons, 09/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Gustaaf Brooijmans, 09/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, John Parsons, 09/12/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Hal Evans, 09/12/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Thomas Schwarz, 09/11/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Gustaaf Brooijmans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Hal Evans, 09/12/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1,
Elliot Lipeles, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Hal Evans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: FW: Homework - Day 1, Elliot Lipeles, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Gustaaf Brooijmans, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Michael Tuts, 09/11/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] FW: Homework - Day 1, Gustaaf Brooijmans, 09/12/2019
Archive powered by MHonArc 2.6.24.