  • From: Thomas Schwarz <schwarzt AT umich.edu>
  • To: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • Cc: "Bee, Chris" <Chris.Bee AT cern.ch>, "cjmey AT iu.edu" <cjmey AT iu.edu>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results
  • Date: Sat, 12 Jun 2021 17:27:34 -0400

Ok, thanks.  So, looking at this, I'm assuming the only thing we really want to show is the 70 and 90% points, as we did before.  So for muons:

image.png

Will we be getting a float simulation, as before, too?

Also, what kind of questions should we be prepared to answer based on the above simulation?  I mean, it says how our costs might end up now with covid, but I'm not sure what I should be saying about it.

Thanks,
Tom
===================
Tom Schwarz
Associate Professor
Department of Physics
University of Michigan 
Office: 734-764-8941
Lab: 734-763-7805
===================



On Fri, Jun 11, 2021 at 2:51 AM Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu> wrote:

Hello all,

There are a few mistakes in the historical numbers in the file George
sent.  (90% costs are base costs.)  Use this one instead.

Best,

Gustaaf

On 6/10/21 9:30 PM, Redlinger, George wrote:
> Hi All,
>
> So as we just discussed in the meeting, I’m sending around the
> simulation results we have so far for Tile and Muons.  The tabs “Cost
> Range Analysis” and “Historical” give the high-level summary
>
> Concerning how we present this material, docDB 876 is what we prepared
> for the FDR:
> https://atlas-hllhc.docdb.bnl.gov/0008/000876/004/risk_summary_NSF.20190815.xlsx
> <https://atlas-hllhc.docdb.bnl.gov/0008/000876/004/risk_summary_NSF.20190815.xlsx>. 
> Presumably each subsystem would show its piece of the table shown in the
> Summary tab.
>
> We’ll probably have to discuss whether or not we want to show the
> historical evolution.
>
> As mentioned, it takes about a day to run each subsystem so LAr and
> Trigger should be appearing in the next couple of days, hopefully.
>
>                 -George
>
>
> _______________________________________________
> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
>
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l



Archive powered by MHonArc 2.6.24.

Top of Page