usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List
List archive
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results
- From: "Redlinger, George" <redlinge AT bnl.gov>
- To: "Schwarz, Thomas" <schwarzt AT umich.edu>, Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
- Cc: "Bee, Chris" <Chris.Bee AT cern.ch>, "cjmey AT iu.edu" <cjmey AT iu.edu>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results
- Date: Sat, 12 Jun 2021 21:55:44 +0000
Hi Tom, All,
So, others should comment, but I think a message might be that the base cost has gone up by XXX (partly due to COVID) but the uncertainty on cost and schedule has gone down since the FDR. The changes to the risks have been pretty minor and the maturity scores (uncertainties) have improved.
One could compare the summary table from docDB 876 with the current version (very fresh, but includes everything) which I’m attaching though it hasn’t really been vetted yet. But this message generally holds across all the systems with the possible exception of the LAr BE electronics and Trigger L0 Calo out in the tail (90% CL).
-George
From: Thomas Schwarz <schwarzt AT umich.edu>
Ok, thanks. So, looking at this, I'm assuming the only thing we really want to show is the 70 and 90% points, as we did before. So for muons:
Will we be getting a float simulation, as before, too?
Also, what kind of questions should we be prepared to answer based on the above simulation? I mean, it says how our costs might end up now with covid, but I'm not sure what I should be saying about it.
Thanks, Tom =================== Tom Schwarz Associate Professor Department of Physics University of Michigan Office: 734-764-8941 Lab: 734-763-7805 ===================
On Fri, Jun 11, 2021 at 2:51 AM Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu> wrote:
|
Attachment:
risk_summary_NSF.20210612.xlsx
Description: risk_summary_NSF.20210612.xlsx
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Redlinger, George, 06/10/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Gustaaf Brooijmans, 06/11/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Thomas Schwarz, 06/12/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, Redlinger, George, 06/12/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Gustaaf Brooijmans, 06/13/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Redlinger, George, 06/13/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Thomas Schwarz, 06/14/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Gustaaf Brooijmans, 06/14/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, John Parsons, 06/14/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, Gustaaf Brooijmans, 06/15/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, Stephanie Majewski, 06/15/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, Redlinger, George, 06/15/2021
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results, Stephanie Majewski, 06/15/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Gustaaf Brooijmans, 06/14/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Thomas Schwarz, 06/14/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Redlinger, George, 06/13/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Thomas Schwarz, 06/12/2021
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] early risk simulation results,
Gustaaf Brooijmans, 06/11/2021
Archive powered by MHonArc 2.6.24.