Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] mod's to L2 and L3 DR talk templates

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "Evans, Harold G." <hgevans AT indiana.edu>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] mod's to L2 and L3 DR talk templates
  • Date: Sun, 26 Feb 2023 12:46:26 -0500


Hi Hal, all,

In reviewing my slides, I have a question about the "charge question" indicators on the various slides. Has someone checked that the ones in the templates are correct? And which charge are we referring to, the (simplified) one for the DR or the one for the actual NSF review?
For example, I notice the "Technical Progress" slide in the template has CQ-2.a. The DR charge has charge questions a through k, and has nothing like 2.a?? So this does not agree with the actual charge that the DR committee will be using?? This suggest the CQ are actually referring to the NSF review charge. However, 2.a there (taken from p. 30 of Mike's slides) is all about uncosted labor and how it is tracked; so this slides does not seem to refer to it either??

I know putting the CQ on each slide is to help the committee write their closeout. However, it is not going to help if we are pointing to the wrong CQ!

Regards,
John

On 2/15/23 2:57 PM, Evans, Harold G. wrote:
Dear NSF L2s,

After a pass through the LAr L2 talk, there are a couple of changes we're proposing to make to the L2 template. I've updated the file in google slides so you can see the changes, and there's a brief description below.
https://urldefense.com/v3/__https://docs.google.com/presentation/d/1NHbjHSzobhhdJmsYbPSpEssTM8XKPCmAApRoBxGMs5g/edit?usp=sharing__;!!P4SdNyxKAPE!Hxy34O5Qg2qT61HaG5cwRQ7YNAdGw3KV7TtYlIlWcScp0rGM9_Sl3i0QlXUowhtWCe91lt4nilm3oV5gwZEllVRwReVl7gizLscMCF15J5H8cdmliPRREw$

<https://urldefense.com/v3/__https://docs.google.com/presentation/d/1NHbjHSzobhhdJmsYbPSpEssTM8XKPCmAApRoBxGMs5g/edit?usp=sharing__;!!P4SdNyxKAPE!Bvk8Ugw5KuZTEJ9_BFWGpsByZfAIl5z7sgZj4nbzU7pnflRKqOq-Aj6HYcLlh4bgtQnHlHfurOfctpZ-KSWsqri41LeUg-gR1tHLzazy-bxfd6Q$>

1. The term "(rebaselining)" is mis-leading when it's used with "World Events" since the entire project is being rebaselined. We propose to remove the qualifiers (rebaselining) and (contingency) from World Events and Know Risks labels respectively.
Slides affected: 16,17,18

2. Trying to put the FDR and new Summary schedules side-by-side makes them both unreadable. So just show the new schedule on slide 14, but include an "x" in the new schedule to indicate where the FDR end-of-production dates occured. It's probably useful to have the (not-so-readable) schedule comparison slide in the backup in case the reviewers want to see the actual comparison.
Slides affected: 14 + new backup

Let me know if there are any questions, or any other suggestions.

Thanks  -  Hal

--

------------------------------------------------------------------------------
 Hal Evans hgevans AT indiana.edu <mailto:hgevans AT indiana.edu>
https://urldefense.com/v3/__http://hgevans.pages.iu.edu/__;!!P4SdNyxKAPE!Hxy34O5Qg2qT61HaG5cwRQ7YNAdGw3KV7TtYlIlWcScp0rGM9_Sl3i0QlXUowhtWCe91lt4nilm3oV5gwZEllVRwReVl7gizLscMCF15J5H8cdmgImbNMw$ <https://urldefense.com/v3/__http://hgevans.pages.iu.edu/__;!!P4SdNyxKAPE!Bvk8Ugw5KuZTEJ9_BFWGpsByZfAIl5z7sgZj4nbzU7pnflRKqOq-Aj6HYcLlh4bgtQnHlHfurOfctpZ-KSWsqri41LeUg-gR1tHLzazyg0KITNE$>
 Tel: (812)856-3828                    Fax: (812)855-5533
 204 Swain Hall West               Indiana University
 727 E. Third St.                Bloomington, IN 47405
------------------------------------------------------------------------------

_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l

--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Hxy34O5Qg2qT61HaG5cwRQ7YNAdGw3KV7TtYlIlWcScp0rGM9_Sl3i0QlXUowhtWCe91lt4nilm3oV5gwZEllVRwReVl7gizLscMCF15J5H8cdkMuGPrxg$


______________________________________________________________________




Archive powered by MHonArc 2.6.24.

Top of Page