Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates
- From: "Evans, Harold G." <hgevans AT indiana.edu>
- To: "Evans, Harold G." <hgevans AT indiana.edu>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>, "parsons AT nevis.columbia.edu" <parsons AT nevis.columbia.edu>
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates
- Date: Mon, 27 Feb 2023 14:25:24 +0000
Hi John,
In the template I circulated, the Charge Questions refer to the charge for the *Director's Review* (not the more detailed charge for the NSF review). We'll need to emphasize to the DR committee that their charge is a scaled-down version of the NSF review
charge aimed to focus on the main issues we need help with.
Best - Hal
On Sun, 2023-02-26 at 12:46 -0500, John Parsons wrote:
This message was sent from a non-IU address. Please exercise caution when clicking links or opening attachments from external sources.
-------
Hi Hal, all,
In reviewing my slides, I have a question about the "charge question"
indicators on the various slides. Has someone checked that the ones in
the templates are correct? And which charge are we referring to, the
(simplified) one for the DR or the one for the actual NSF review?
For example, I notice the "Technical Progress" slide in the template
has CQ-2.a. The DR charge has charge questions a through k, and has
nothing like 2.a?? So this does not agree with the actual charge that
the DR committee will be using?? This suggest the CQ are actually
referring to the NSF review charge. However, 2.a there (taken from p.
30 of Mike's slides) is all about uncosted labor and how it is tracked;
so this slides does not seem to refer to it either??
I know putting the CQ on each slide is to help the committee write
their closeout. However, it is not going to help if we are pointing to
the wrong CQ!
Regards,
John
On 2/15/23 2:57 PM, Evans, Harold G. wrote:
Dear NSF L2s,
After a pass through the LAr L2 talk, there are a couple of changes
we're proposing to make to the L2 template. I've updated the file in
google slides so you can see the changes, and there's a brief
description below.
https://docs.google.com/presentation/d/1NHbjHSzobhhdJmsYbPSpEssTM8XKPCmAApRoBxGMs5g/edit?usp=sharing <https://urldefense.com/v3/__https://docs.google.com/presentation/d/1NHbjHSzobhhdJmsYbPSpEssTM8XKPCmAApRoBxGMs5g/edit?usp=sharing__;!!P4SdNyxKAPE!Bvk8Ugw5KuZTEJ9_BFWGpsByZfAIl5z7sgZj4nbzU7pnflRKqOq-Aj6HYcLlh4bgtQnHlHfurOfctpZ-KSWsqri41LeUg-gR1tHLzazy-bxfd6Q$>
1. The term "(rebaselining)" is mis-leading when it's used with "World
Events" since the entire project is being rebaselined. We propose to
remove the qualifiers (rebaselining) and (contingency) from World Events
and Know Risks labels respectively.
Slides affected: 16,17,18
2. Trying to put the FDR and new Summary schedules side-by-side makes
them both unreadable. So just show the new schedule on slide 14, but
include an "x" in the new schedule to indicate where the FDR
end-of-production dates occured. It's probably useful to have the
(not-so-readable) schedule comparison slide in the backup in case the
reviewers want to see the actual comparison.
Slides affected: 14 + new backup
Let me know if there are any questions, or any other suggestions.
Thanks - Hal
--
------------------------------------------------------------------------------
Tel: (812)856-3828 Fax: (812)855-5533
204 Swain Hall West Indiana University
727 E. Third St. Bloomington, IN 47405
------------------------------------------------------------------------------
_______________________________________________
Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
--
------------------------------------------------------------------------------
Hal Evans hgevans AT indiana.edu
Tel: (812)856-3828 Fax: (812)855-5533
204 Swain Hall West Indiana University
727 E. Third St. Bloomington, IN 47405
------------------------------------------------------------------------------
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] mod's to L2 and L3 DR talk templates,
Evans, Harold G., 02/15/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] mod's to L2 and L3 DR talk templates,
John Parsons, 02/26/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates,
Evans, Harold G., 02/27/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates,
John Parsons, 02/27/2023
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates, Evans, Harold G., 02/27/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates,
John Parsons, 02/27/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] [External] Re: mod's to L2 and L3 DR talk templates,
Evans, Harold G., 02/27/2023
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] mod's to L2 and L3 DR talk templates,
John Parsons, 02/26/2023
Archive powered by MHonArc 2.6.24.