usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List
List archive
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] DOE IPR/CD-3a Closeout Report
- From: Tim Andeen <timothy.robert.andeen AT cern.ch>
- To: John Parsons <parsons AT nevis.columbia.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] DOE IPR/CD-3a Closeout Report
- Date: Fri, 12 Jul 2019 11:04:06 +0200
Hi John,
Congratulations, I see in the notes there are no substantial comments or recommendations for LAr! A very clean review. I know that was due to a great deal of work.
>With no rest for the weary, we move on now to finalizing the documents needed for the upcoming NSF FDR DR
Indeed, though I hope we can profit from the work for the DOE review. Can you send the L2 slides you showed? I assume you'll use many of the same technical figures (of course the schedule/etc come from docdb840) and we can start putting these in our L3 talks.
>With no rest for the weary, we move on now to finalizing the documents needed for the upcoming NSF FDR DR
Indeed, though I hope we can profit from the work for the DOE review. Can you send the L2 slides you showed? I assume you'll use many of the same technical figures (of course the schedule/etc come from docdb840) and we can start putting these in our L3 talks.
Do we have a sense of when the practice will be? I assume next week, and my schedule is filling up.
Best, Tim
On Thu, Jul 11, 2019 at 10:44 PM John Parsons <parsons AT nevis.columbia.edu> wrote:
Hi all,
As you can see from the attached close-out report,
we just concluded a very successful 3-day DOE review!
Congratulations in particular to Hong and Hao for their
excellent preparations and presentations.
With no rest for the weary, we move on now to
finalizing the documents needed for the upcoming
NSF FDR DR (July 29-31 at Columbia) and FDR (Sept. 11-13
at NSF headquarters outside DC). Having successfully
navigated the LAr DOE scope through the latest review,
we need now to do the same on the NSF side.
Regards,
John
-------- Forwarded Message --------
Subject: [Usatlas-hllhc-l2l3ics-l] DOE IPR/CD-3a Closeout Report
Date: Thu, 11 Jul 2019 20:34:41 +0000
From: Kotcher, Jonathan <kotcher AT bnl.gov>
To: usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
All –
Attached, please find the closeout report from this week’s DOE IPR/CD-3a
review. We will have the final report in hand by early next week – I’d
suggest you wait for that for any broader distribution. In the
meantime, you can share this in more limited form – to institution
principals or principal ATLAS colleagues -- as you see fit.
Our congratulations to all on a very strong and positive review – and
thank you for your efforts that made this week such a success --
Best regards –
Jon, for the Project Office
_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l
---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX): +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu
---------------
Tim Andeen
Assistant Professor, Department of Physics
College of Natural Sciences
The University of Texas at Austin
Austin, TX 78712-1192
web: tandeen.web.cern.ch
office (TX): PMA 10.208
office (CERN): 304/1-024
ph (TX): +1 512 475-9575
ph (CERN): +41 (0)22 76 758 14
email: tandeen AT utexas.edu
---------------
-
[Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] DOE IPR/CD-3a Closeout Report,
John Parsons, 07/11/2019
- Re: [Usatlas-hllhc-lartl2l3-l] Fwd: [Usatlas-hllhc-l2l3ics-l] DOE IPR/CD-3a Closeout Report, Tim Andeen, 07/12/2019
Archive powered by MHonArc 2.6.24.