Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "Ma, Hong" <hma AT bnl.gov>
  • Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
  • Date: Fri, 7 Mar 2025 18:38:50 -0500


Hi Hong,

Thanks for posting the draft slides, which are very good. I give some comments and suggestions below.

Regards,
John


p. 6 – the bottom line is BNL needs to test ~40k ASICs. That msg is a bit overwritten by your last bullet ending in 55188 spares. Maybe stress the 40k number at BNL instead?
p. 7 – could go in backup?
p. 9 – maybe add a bullet (in a different color for emphasis) stressing that you have received ALL the packaged production chips
p. 10 – ‘More recently, the system has been integrated with the robotic system developed by IJCLab
- not sure why photo stresses “RF switches”?? Could label more (eg. test socket)?

p. 11 – add bullet saying that we are following ATLAS requirements (eg. doing 11 per lot), since otherwise numbers seem a bit arbitrary
- in last bullet, “pass” should be “passed”
- add final bullet saying “Radiation qualification of production ASICs complete”

p. 12 – some problems with formatting (at least in my pdf viewer)

p. 13 – “except for the electromagnetic interference (EMI)” raises questions but does not answer the. Eg. say EMI is causing noise to be higher than expected; under investigation” or something like that
- similarly “system reliability (including socket performance degradation) issue is being investigated” does not make clear you are seeing issues, as are others using same socket, incl. IJC Lab for ALFE2 and UT Austin for ADC

p. 15 – “Flood in IJCLab in 10/24 disabled the robot testing there for many months, and has delayed comparing performance in the 2 setups”

p. 21 – would be good to give target for PRR; eg. June, as discussed during LAr Week?

p. 26 – to save presentation time, I don’t think I will update this “cartoon schedule”, since it is anyway not very useful and it would anyway go to backup (you have the more useful info on p. 27)

p. 29 – capitalize “Rank” consistently
- typo “PPR” should be “PRR”
- Last bullet about “some risks” is not clear. Which ones? (maybe just delete this bullet?)

p. 30 – maybe add that, according to current working schedule, all work will be done by 30-Mar-2026


On 3/5/25 3:17 PM, Ma, Hong wrote:
Hi John,

                I have posted my L3 talks as docdb 1834.

https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ShowDocument? docid=1834 <https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ ShowDocument?docid=1834>

                At least two slides need updates:

Slide 17 for some example distributions of measurements with the robot.

Slide 26 needs an updated DOE Scope schedule that you normally update.   I suppose this schedule is for the baseline.  PA/Shaper has no change in baseline, while Sys Integration had changes recently due to the NSF BCPs.     I discuss the delay in the working schedule on slide 27.

                Best,

                Hong.

*From: *usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc- lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
*Date: *Sunday, March 2, 2025 at 2:22 PM
*To: *us-atlas-hllhc-pmgmt-l AT lists.bnl.gov <us-atlas-hllhc-pmgmt- l AT lists.bnl.gov>, usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc- lartl2l3-l AT lists.bnl.gov>
*Subject: *[[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides


Hi all,

        I have posted a draft of my LAr L2 plenary talk slides for the upcoming
DOE IPR in docdb #1829.  Comments are welcome.
        Regards,
                John

--
______________________________________________________________________

John Parsons
Nevis Labs,              Email: parsons AT nevis.columbia.edu
  Columbia University   Phone: (914) 591-2820
P.O. Box 137            Fax: (914) 591-8120
Irvington, NY 10533     WWW: https://urldefense.com/v3/__http:// https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!DMhNy0xC6e_LAKQWEOL-__;Kg!!P4SdNyxKAPE!EUbwW2SE0rR1skrx_D3JED6NlAgM332Iev5xvYh8iQovrOO57k7scrK_Bp_SSzt61inClCtt3Wg7Pq0BQnRcSRK5sLLbj7stje4DSgNF1jDdmg$ km1fTdXIVbu2RXIxEhxQfzu- rYjPfenmZau35LYUnM5ROnvjFf5LhslX3VISFvwLTLVliRkQFQHV3-raE4wuWycLmQ$ <https://urldefense.com/v3/__http:/www.nevis.columbia.edu/*parsons/ __;fg!!P4SdNyxKAPE!DMhNy0xC6e_LAKQWEOL-km1fTdXIVbu2RXIxEhxQfzu- rYjPfenmZau35LYUnM5ROnvjFf5LhslX3VISFvwLTLVliRkQFQHV3-raE4wuWycLmQ$>

______________________________________________________________________


--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!EUbwW2SE0rR1skrx_D3JED6NlAgM332Iev5xvYh8iQovrOO57k7scrK_Bp_SSzt61inClCtt3Wg7Pq0BQnRcSRK5sLLbj7stje4DSgOfGh-wxw$


______________________________________________________________________




Archive powered by MHonArc 2.6.24.

Top of Page