usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List
List archive
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
- From: "Xu, Hao" <haoxu AT bnl.gov>
- To: "Parsons, John" <parsons AT nevis.columbia.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
- Date: Mon, 10 Mar 2025 01:32:28 +0000
Thanks John for your comments and suggestions.
The slides have been revised accordingly and uploaded to docdb.
Regards,
Hao
From: John Parsons <parsons AT nevis.columbia.edu>
Sent: Friday, March 7, 2025 6:39 PM
To: Xu, Hao <haoxu AT bnl.gov>
Cc: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
Sent: Friday, March 7, 2025 6:39 PM
To: Xu, Hao <haoxu AT bnl.gov>
Cc: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
Hi Hao,
Thanks for posting the nice draft slides. I give some comments and
suggestions below.
Regards,
John
p. 5 – needs to be updated (eg. “perform system performance tests of
Analog Testboard and Slice Testboard as soon as available.” Is very
out-of-date
- add bullet mentioning FEC System Test??
p. 6 – “functionality test” will be performed at Nevis, but you will do
final performance test, including after integration with L1 trigger (ie.
with LSB2 boards + LTDB)
p. 7 – “Next one is planned in May 2025”
- “Ramoing up to multiple FEB2 boards in FEC test (so far, 2 FEB2 boards
tested together)
- database work has already started, so maybe say “will significantly
advance in 2025”?
p. 10 – “Verified that power bus noise mitigation strategy implemented
in FEB2 works”
p. 12 – label the various photos??
- I find pages 12-14 a bit redundant/overlapping; could maybe make more
clear and consolidate to 2 slides??
p. 15 – change “would be” to “will be”
- reviewers will not understand what “heat transfer plate” is, unless
you provide some explanation
p. 18 – not clear what “System Integration” line in ext dep table
means?? Also 50% FEB2 testing in France does not impact you, since you
only have to do 50% no matter what. Maybe just delete this table??
- add LVPS from INFN Milano
p. 20 – “from accessing the FEC test stand”
p. 23 I will probably not update the schedule “cartoon” since it is not
so useful and anyway would go to backup. I think you can just delete
this slide.
p. 25 – BCP-123 should not be included on this slide, since it was
before the previous IPR
p. 26 – simplify to “FEB2 QC tests and delivery to CERN are on Critical Path
p. 27 – move to backup
p. 29 – move realized risks above remaining ones, and re-label them as
“Partially realized risks” (since you still have them as active in the RR)
- delete “Custom-designed hardware” and “FEB2 production” sub-bullets,
since these are not actual risks in RR (they are covered by the External
Dependency risks
p. 30 – “System integration has suffered some delays due to external
dependencies (ie. delays in delivery of the various boards). However,
those challenges hve been overcoming, and it is now progressing well”
- I think you can remove the last bullet. At this stage, we are no
longer talking about BOEs, how RLS was developd, etc., but just
discussing status and performance against plan
On 3/6/25 9:12 PM, Xu, Hao wrote:
> Hi John,
>
> I have uploaded my slides to docdb 1843.
> https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ShowDocument?docid=1843
>
>
> Regards,
>
> Hao
>
> ________________________________
> From: Xu, Hao <haoxu AT bnl.gov>
> Sent: Wednesday, March 5, 2025 11:58 PM
> To: Parsons, John <parsons AT nevis.columbia.edu>; Ma, Hong <hma AT bnl.gov>
> Cc: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
> Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
>
> Thanks John.
> I will upload my slides tomorrow.
> Regards,
> Hao
> ________________________________
> From: usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
> Sent: Wednesday, March 5, 2025 3:22:44 PM
> To: Ma, Hong <hma AT bnl.gov>
> Cc: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
> Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
>
>
> Hi Hong,
>
> Thanks for the feedback on my slides and for posting yours. I will
> take a look (probaably on the flight back on Friday) and get back to you
> with any suggestions.
>
> @Hao, can you post a draft of your slides asap, hopefully by Thurs.
> afternoon to give me time to download them before my flight?
>
> Regards,
> John
>
> On 3/5/25 3:17 PM, Ma, Hong wrote:
>> Hi John,
>>
>> I have posted my L3 talks as docdb 1834.
>>
>> https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/ShowDocument?
>> docid=1834 <https://atlas-hllhc.docdb.bnl.gov/cgi-bin/private/
>> ShowDocument?docid=1834>
>>
>> At least two slides need updates:
>>
>> Slide 17 for some example distributions of measurements with the robot.
>>
>> Slide 26 needs an updated DOE Scope schedule that you normally update.
>> I suppose this schedule is for the baseline. PA/Shaper has no change
>> in baseline, while Sys Integration had changes recently due to the NSF
>> BCPs. I discuss the delay in the working schedule on slide 27.
>>
>> Best,
>>
>> Hong.
>>
>> *From: *usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc-
>> lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons
>> <parsons AT nevis.columbia.edu>
>> *Date: *Sunday, March 2, 2025 at 2:22 PM
>> *To: *us-atlas-hllhc-pmgmt-l AT lists.bnl.gov <us-atlas-hllhc-pmgmt-
>> l AT lists.bnl.gov>, usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-
>> lartl2l3-l AT lists.bnl.gov>
>> *Subject: *[[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides
>>
>>
>> Hi all,
>>
>> I have posted a draft of my LAr L2 plenary talk slides for the
>> upcoming
>> DOE IPR in docdb #1829. Comments are welcome.
>> Regards,
>> John
>>
>> --
>> ______________________________________________________________________
>>
>> John Parsons
>> Nevis Labs, Email: parsons AT nevis.columbia.edu
>> Columbia University Phone: (914) 591-2820
>> P.O. Box 137 Fax: (914) 591-8120
>> Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://
>> https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!DMhNy0xC6e_LAKQWEOL-__;Kg!!P4SdNyxKAPE!A1hQhGGSdCARLkwSbgHj5F-jheCVeakH0dFRQeXJNlCefoAeSfwZNqcgfmjeRNpXBMp2qSzZtP0qs-RKAO_4wyaVoQia-e-U0wOiZ7evUDmzng$
>> km1fTdXIVbu2RXIxEhxQfzu-
>> rYjPfenmZau35LYUnM5ROnvjFf5LhslX3VISFvwLTLVliRkQFQHV3-raE4wuWycLmQ$
>> <https://urldefense.com/v3/__http:/www.nevis.columbia.edu/*parsons/
>> __;fg!!P4SdNyxKAPE!DMhNy0xC6e_LAKQWEOL-km1fTdXIVbu2RXIxEhxQfzu-
>> rYjPfenmZau35LYUnM5ROnvjFf5LhslX3VISFvwLTLVliRkQFQHV3-raE4wuWycLmQ$>
>>
>> ______________________________________________________________________
>>
>
> --
> ______________________________________________________________________
>
> John Parsons
> Nevis Labs, Email: parsons AT nevis.columbia.edu
> Columbia University Phone: (914) 591-2820
> P.O. Box 137 Fax: (914) 591-8120
> Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!A1hQhGGSdCARLkwSbgHj5F-jheCVeakH0dFRQeXJNlCefoAeSfwZNqcgfmjeRNpXBMp2qSzZtP0qs-RKAO_4wyaVoQia-e-U0wOiZ7fEZH2PNA$
>
> ______________________________________________________________________
>
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!FRMOp5_UvBL5f_OKN0MiHsqXCVHCcXXQXE_9h7otesIdw6Q8u3zPUKw33rppV3CB1HlmvpBmrmirDVtXwclhSqQ$
______________________________________________________________________
-
[[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
John Parsons, 03/02/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Ma, Hong, 03/05/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
John Parsons, 03/05/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Xu, Hao, 03/05/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Xu, Hao, 03/06/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides, John Parsons, 03/06/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
John Parsons, 03/07/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides, Xu, Hao, 03/09/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Xu, Hao, 03/06/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Xu, Hao, 03/05/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
John Parsons, 03/07/2025
- Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides, Ma, Hong, 03/09/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
John Parsons, 03/05/2025
-
Re: [[Usatlas-hllhc-lartl2l3-l] ] draft LAr L2 plenary slides,
Ma, Hong, 03/05/2025
Archive powered by MHonArc 2.6.24.