Minutes shift change 2023-05-02

general
—————
- yesterday have submitted for approval to IRR, still with IRR: question regarding electrical connectors
- scaffolding boards have been painted on one side, now drying
- paint other side tomorrow (We)
- dry by Th evening
- plan was to put scaffolding back on Friday morning
- but now CAD wants to keep scaffolding out until BHSO approval:  does not sound like a good idea to me b/c of indefinite time scale
- magnet inspection Fr 11-12
- liquid nitrogen will come Friday to fill dewar

access to bore wait list
———————————————
iHCal, EMCal, INTT, TPOT, MVTX (not available Friday)

evening:  Genki
- busy shift
- four audio alarms, three of those triggered by EMCal dura chillers, low reservoir level
  - contacted Joel and Lee
  - solution at the time was to acknowledge with vision application (not obvious)
  - Lee worked on a fix today
  - fourth alarm racks 1W1, 1W2
    - acknowledged
    - couldn’t turn on 1W2
    - breaker was off
    - according to Joel already off

night:  Hanpu
- 5:00am TPC/TPOT coolant empty alarm
  - outgoing shift crew confirmed not a serious problem
- 6:00am EMCal filter removed alarm
  - acknowledged
- EMCal SiPM voltage question
  - Cameron:  will be updated in checklist
  - Sean:  currently still in expert mode

day:  Sookhyun
- quiet morning
- 10:00am INTT work on 2W1 and 2W3 and bias testing North and South side
- 11:30am plug door test
- same chiller alarm, acknowledged
- tested audible INTT alarms

MBD (Abdul)
- finished HV GUI, will pass to shift crew soon
- Sal finished FEM boards
- plugged in FEM boards
- working on stabilizing laser time

HCal (Hanpu)
- Dan Richford fixed sector 31, ch 5 which had no LED signal, changed backplane
  - still need to check after we get HCal back from Martin
  - Martin:  tested what he was working on yesterday, not there yet, need another evening, hopefully will hand to Hanpu before his shift

Emcal (Sean)
- waiting for access to bore to fix channels
- Anthony working on bias voltage
- Rob working on insulating SiPM cooling lines

TPOT (John K)
- waiting for bore access

TPC (Jin)
- consistently taking pedestal data also with TPOT
- Takao updated automated FEE recovery
- Martin updated decoder, on github
- server updates, 24 GTM connections
- plan for next 24 h:  expect operation in remote expert mode
- shift crew check usual safety items (like temperatures, flow rate) 

INTT (Genki)
- interlock system upgraded filter system for bias
  - tested, working
- debugged LV GUI
 - waiting for rcdaq migration (in progress)
- interlocks not tested yet, not in hands of shift crew yet

MVTX (Cameron)
- rewiring flow switches for remote I/O monitor
  - several flow switches active, others not
  - flow rate has dropped to 1.5 l/m (alert:  at 1.4 l/m)
    - will reach out to manufacturer (stave cooling)
  - investigating wiring of pressure sensors (4/6 stopped working)
  - rack 2E1(currently yellow) hopefully back after that
  - waiting for access 

DAQ
- working on re-write of server that gives us access to DCM2s and partitioners
  - unless you configure system every single time you are not able to start second run
  - related to management of hold and busy
  - will have self diagnostics
- Mickey and Dan L got Lvl1 to produce triggers from laser pulser
  - Dan will try to read out laser data from forced accepts



---------------------------------------------------------------------------------
Stefan Bathe
Professor of Physics
Baruch College, CUNY
and RIKEN Visiting Scientist

Baruch:                                     BNL:
17 Lexington Ave                      Bldg. 510
office 940                                  office 2-229
phone 646-660-6272                phone 631-344-8490
----------------------------------------------------------------------------------





  • [Sphenix-run-l] Minutes shift change 2023-05-02, Stefan Bathe, 05/02/2023

Archive powered by MHonArc 2.6.24.

Top of Page