Hi Gerard,
I just finished the layout for v3.0 T-board, please find the gerber files
in the attachment or the following link.
(https://drupal.star.bnl.gov/STAR/blog/jndong/191204-gerber-files-t-board-v30)
Since the new year is approaching, I think it will take at least 4~5 weeks
for production in China after your final approval.
Best,
Jianing
> -----原始邮件-----
> 发件人: "Gerard Visser" <gvisser AT indiana.edu>
> 发送时间: 2019-12-04 05:32:29 (星期三)
> 收件人: star-fst-l AT lists.bnl.gov
> 抄送:
> 主题: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time
>
> hi Mike,
> I think if we truly need more than two or so T-boards for first
> tests, then
> this is indeed a sensible approach. Modifying two or three or so, testing
> everything, making any further changes anywhere (T boards and hybrids) if
> needed
> -- hopefully not -- infomed by _complete_ results (pedestals/noise and
> cosmics)
> from that testing, and then going for production would maybe be better. But
> I
> agree modifying many of the old design doesn't make much sense.
> Jianing, would the v3.0 layout be ready to fab, or more work needed
> in your
> opinion?
>
> Gerard
>
> On 12/3/2019 3:04 PM, Capotosto, Michael wrote:
> > Zhenyu/Gerard and all,
> >
> > I just wanted to get a jump and get this suggestion out before the
> > meeting. I've spoken with John Hammond regarding the modifications
> > required to the current V2.1 T-Boards, and we agreed it will probably be
> > a few hours of work per board - removing the duplicate components, and
> > adding worst case ~8 jumper wires, some of which need to cross to both
> > sides of the board.
> >
> > If we create new gerbers to match the V3.0 T-Board schematic, we may be
> > able to do a fast turn turnkey run. Getting approximate quotes from
> > Sierra Circuits, who we've used for turnkeys before, it would be ~$2,600
> > to have 10 PCBs fabbed, and stuffed for an 8-day turn. If this is
> > something that Jianing and Gerard wouldn't have time to work on, John
> > believes he can make the changes to the gerbers directly, and send the
> > files out, if Gerard approves the changes listed.
> >
> > If we were to also make 10 "test stand cables" using the new "purple"
> > cable, we would be looking at ~$2,400.
> >
> > It would cost another ~$1,350 to attach these cables to the t-board.
> >
> >
> >
> > This would all come to a total of $6,350. We may be able to get this
> > price down a little bit if we got quotes from local fab houses as well,
> > and by combining the job of making 10 "purple cable" assemblies and
> > assembling them to the pcb - this is a rough number.
> >
> > I believe this may be a good option - we would have the new revision of
> > the board with no bodge wires, we'd be using the production cable and
> > testing with its dielectric properties, etc., a better representation of
> > the final product; but it may be a tight deadline if we need it by
> > mid-January. If you think this is something we'd be interested in
> > pursuing I can start requesting quotes and see if we'd be able to have
> > more definite numbers by the meeting on Thursday.
> >
> > Best,
> >
> > Mike Capotosto
> >
> > -----Original Message-----
> > From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Ye,
> > Zhenyu
> > Sent: Tuesday, December 3, 2019 1:00 PM
> > To: star-fst-l AT lists.bnl.gov
> > Subject: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time
> >
> > Dear all,
> >
> > We will have a weekly FST meeting this Thursday 9:30am BNL time. The
> > meeting agenda and bluejeans info can be found at
> > https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-weekly-meeting
> >
> > 1. T-board and inner signal cable - Jianing Dong, Mike Capotosto, Gerard
> > Visser
> > Gerard is reviewing the changes to v2.1 T-board suggested by Mike.
> >
> > 2. Mechanical Structure - Yi Yang, Han-sheng Li
> > Updates on the status of mechanical structure fabrication and assembly,
> > cooling soft tube compatibility test, and transportation box design
> >
> > 3. Module Assembly at Fermilab - Zhenyu Ye
> > Updates on module assembly fixture/tooling design/fabrication
> >
> > 4. Simulation: Te-Chuan Huang, Krishan Gopal
> > Updates from Te-Chuan on FST geometry modeling
> >
> > If there is anything else to report/discuss, please let me know.
> >
> > Best
> > Zhenyu
> > _______________________________________________
> > Star-fst-l mailing list
> > Star-fst-l AT lists.bnl.gov
> > https://lists.bnl.gov/mailman/listinfo/star-fst-l
> > _______________________________________________
> > Star-fst-l mailing list
> > Star-fst-l AT lists.bnl.gov
> > https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
Attachment:
T-Board_v3-gerber-191204.zip
Description: Zip compressed data
-
[Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Ye, Zhenyu, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Gerard Visser, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Zhenyu Ye, 12/03/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Aschenauer Elke-Caroline, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
董家宁, 12/04/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/04/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Gerard Visser, 12/04/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Gerard Visser, 12/09/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/09/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Gerard Visser, 12/09/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, 董家宁, 12/10/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Capotosto, Michael, 12/10/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Gerard Visser, 12/10/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Aschenauer Elke-Caroline, 12/10/2019
- Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time, Capotosto, Michael, 12/10/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Gerard Visser, 12/09/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/09/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/04/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Zhenyu Ye, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Gerard Visser, 12/03/2019
-
Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time,
Capotosto, Michael, 12/03/2019
Archive powered by MHonArc 2.6.24.