  • From: Gerard Visser <gvisser AT indiana.edu>
  • To: "Capotosto, Michael" <capotosto AT bnl.gov>, 董家宁 <jndong AT sdu.edu.cn>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time
  • Date: Mon, 9 Dec 2019 17:38:48 -0500

I do not know what a vendor is supposed to do with "pad master top". It's probably not relevant for fabrication? Anyway, for best results send only the data the vendor really needs. (And actually, I would highly recommend a fab drawing including a table of the gerber filenames/meanings, as well a drill symbol table, fab notes, etc. But, it is OK to skip the fab drawing, just potentially there could be a mistake on some design some day, that would be prevented by having a proper fab drawing.)

Gerard

p.s. I think my gerber viewer reports smallest dcode on copper layers is 0.18mm, as you say below. (Which is a good min trace size for this board in my opinion, and 0.3mm is a good via hole finished diameter.)


On 12/9/2019 5:22 PM, Capotosto, Michael wrote:
Gerard,

Just an FYI - I struggled interpreting the gerbers previously, I believe Jianing is using Altium, and I've found this PDF helpful for gerber output extensions. https://urldefense.proofpoint.com/v2/url?u=http-3A__valhalla.altium.com_Learning-2DGuides_OG0101-2520Gerber-2520Output-2520Options.pdf&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=8ygAAI6gQzVe9hFCRdEAO5MwBJh2ID34fiwLpV3P1Xo&m=IEOF-zJ_F1lhpa42yMmY68QAdABvfHUJ1rt2m8jmgdw&s=sjFrD6Ki-XNhOY_Hdw0H3lrd25FQB9SxtBGTvgJPOek&e=
For example, it lists GPT as "Pad Master Top", and GTP as "Top Paste Mask".

Jianing, can you confirm that your smallest drill is a 0.3mm? The smallest
trace width/trace space I saw were 0.18mm (Greater than the standard minimum
of 6 mil/6 mil), were there any smaller? If I did miss any smaller this may
affect the quote price.

Thank you

--Mike

-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Gerard Visser
Sent: Monday, December 9, 2019 5:01 PM
To: 董家宁 <jndong AT sdu.edu.cn>
Cc: star-fst-l AT lists.bnl.gov
Subject: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

hi Jianing,
All looks reasonable I think. We should build it.
One small point, it seems the wire solder holes have solder paste in
the paste gerber data. This is probably not what we want. Perhaps the
assembly vendor knows to delete it, or can be asked to delete it. It's
probably better if you delete it though.
[Woops. Now I see there are two sets of paste files??? E.g. ".GPT" vs.
".GTP".
And one of these has paste on the wire holes, one does not. My suggestion is get rid of
the files the fab and assembly vendors don't need or want. (Some/all of the
"mechanical" gerbers are also irrelevant to the fabrication, maybe. You have
a lot of files here, for a four-layer board.]
Anyway, I suggest proceed to build this but I think it would well for
Jianing (and Mike) to first make sure about the fab files details.
Thanks, sincerely,

Gerard


On 12/4/2019 4:52 AM, 董家宁 wrote:
Hi Gerard,
I just finished the layout for v3.0 T-board, please find the gerber files
in the attachment or the following link.
(https://drupal.star.bnl.gov/STAR/blog/jndong/191204-gerber-files-t-board-v30)
Since the new year is approaching, I think it will take at least 4~5
weeks for production in China after your final approval.

Best,
Jianing

-----原始邮件-----
发件人: "Gerard Visser" <gvisser AT indiana.edu>
发送时间: 2019-12-04 05:32:29 (星期三)
收件人: star-fst-l AT lists.bnl.gov
抄送:
主题: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

hi Mike,
I think if we truly need more than two or so T-boards for first
tests, then this is indeed a sensible approach. Modifying two or
three or so, testing everything, making any further changes anywhere
(T boards and hybrids) if needed
-- hopefully not -- infomed by _complete_ results (pedestals/noise
and cosmics) from that testing, and then going for production would
maybe be better. But I agree modifying many of the old design doesn't make
much sense.
Jianing, would the v3.0 layout be ready to fab, or more work needed
in your opinion?

Gerard

On 12/3/2019 3:04 PM, Capotosto, Michael wrote:
Zhenyu/Gerard and all,

I just wanted to get a jump and get this suggestion out before the meeting.
I've spoken with John Hammond regarding the modifications required to the
current V2.1 T-Boards, and we agreed it will probably be a few hours of work
per board - removing the duplicate components, and adding worst case ~8
jumper wires, some of which need to cross to both sides of the board.

If we create new gerbers to match the V3.0 T-Board schematic, we may be able
to do a fast turn turnkey run. Getting approximate quotes from Sierra
Circuits, who we've used for turnkeys before, it would be ~$2,600 to have 10
PCBs fabbed, and stuffed for an 8-day turn. If this is something that Jianing
and Gerard wouldn't have time to work on, John believes he can make the
changes to the gerbers directly, and send the files out, if Gerard approves
the changes listed.

If we were to also make 10 "test stand cables" using the new "purple" cable,
we would be looking at ~$2,400.

It would cost another ~$1,350 to attach these cables to the t-board.



This would all come to a total of $6,350. We may be able to get this price down a
little bit if we got quotes from local fab houses as well, and by combining the job of
making 10 "purple cable" assemblies and assembling them to the pcb - this is
a rough number.

I believe this may be a good option - we would have the new revision of the
board with no bodge wires, we'd be using the production cable and testing
with its dielectric properties, etc., a better representation of the final
product; but it may be a tight deadline if we need it by mid-January. If you
think this is something we'd be interested in pursuing I can start requesting
quotes and see if we'd be able to have more definite numbers by the meeting
on Thursday.

Best,

Mike Capotosto

-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Ye,
Zhenyu
Sent: Tuesday, December 3, 2019 1:00 PM
To: star-fst-l AT lists.bnl.gov
Subject: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

Dear all,

We will have a weekly FST meeting this Thursday 9:30am BNL time. The
meeting agenda and bluejeans info can be found at
https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-track
er-weekly-meeting

1. T-board and inner signal cable - Jianing Dong, Mike Capotosto,
Gerard Visser Gerard is reviewing the changes to v2.1 T-board suggested by
Mike.

2. Mechanical Structure - Yi Yang, Han-sheng Li Updates on the
status of mechanical structure fabrication and assembly, cooling
soft tube compatibility test, and transportation box design

3. Module Assembly at Fermilab - Zhenyu Ye Updates on module
assembly fixture/tooling design/fabrication

4. Simulation: Te-Chuan Huang, Krishan Gopal Updates from Te-Chuan
on FST geometry modeling

If there is anything else to report/discuss, please let me know.

Best
Zhenyu
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l





Archive powered by MHonArc 2.6.24.

Top of Page