Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Gerard Visser <gvisser AT indiana.edu>
  • To: "Capotosto, Michael" <capotosto AT bnl.gov>, 董家宁 <jndong AT sdu.edu.cn>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time
  • Date: Wed, 4 Dec 2019 10:21:29 -0500

hi Mike,
I think you should definitely proceed to get quotes, thanks. And make P/N changes as may be required for that.
Specifically on the below, I don't find the original 0603L025YRHF on Littelfuse website even. Not sure what that is. 0603L025YR looks correct to me. The others are just the usual sort of packaging / leadfree suffix partnumber details, looks definitely fine (and if you find more such, just do I'd say). If you find anything substantial that has to change, e.g. due to stock availability, then we have to hear from Jianing.
Sincerely,

Gerard

On 12/4/2019 10:04 AM, Capotosto, Michael wrote:
Gerard, Jianing,


Due to the tight timeline, I was going to get quotes for a turnkey production
- The fab house orders the parts, PCBs, and does the assembly. A 10-day
turnaround for a small 4-layer board like this isn't uncommon.

I'm going through the BOM again to make sure the parts are still available,
I'll attach the document.

I'd like to make the following changes:
1. F1, F2 - Originally 0603L025YRHF - Change to 0603L025YR‎
2. R23 - Originally CRCW0402100RFKEA - Change to CRCW0402100RFKED
3. U3 - Originally TMP102AID - Change to TMP102AIDRLR

Please let me know your thoughts on these changes.


Thanks,
Mike


-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of ???
Sent: Wednesday, December 4, 2019 4:52 AM
To: gerard visser <gvisser AT indiana.edu>
Cc: star-fst-l AT lists.bnl.gov
Subject: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

Hi Gerard,
I just finished the layout for v3.0 T-board, please find the gerber files
in the attachment or the following link.
(https://drupal.star.bnl.gov/STAR/blog/jndong/191204-gerber-files-t-board-v30)
Since the new year is approaching, I think it will take at least 4~5 weeks
for production in China after your final approval.

Best,
Jianing

-----原始邮件-----
发件人: "Gerard Visser" <gvisser AT indiana.edu>
发送时间: 2019-12-04 05:32:29 (星期三)
收件人: star-fst-l AT lists.bnl.gov
抄送:
主题: Re: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

hi Mike,
I think if we truly need more than two or so T-boards for first
tests, then this is indeed a sensible approach. Modifying two or three
or so, testing everything, making any further changes anywhere (T
boards and hybrids) if needed
-- hopefully not -- infomed by _complete_ results (pedestals/noise and
cosmics) from that testing, and then going for production would maybe
be better. But I agree modifying many of the old design doesn't make much
sense.
Jianing, would the v3.0 layout be ready to fab, or more work needed
in your opinion?

Gerard

On 12/3/2019 3:04 PM, Capotosto, Michael wrote:
Zhenyu/Gerard and all,

I just wanted to get a jump and get this suggestion out before the meeting.
I've spoken with John Hammond regarding the modifications required to the
current V2.1 T-Boards, and we agreed it will probably be a few hours of work
per board - removing the duplicate components, and adding worst case ~8
jumper wires, some of which need to cross to both sides of the board.

If we create new gerbers to match the V3.0 T-Board schematic, we may be able
to do a fast turn turnkey run. Getting approximate quotes from Sierra
Circuits, who we've used for turnkeys before, it would be ~$2,600 to have 10
PCBs fabbed, and stuffed for an 8-day turn. If this is something that Jianing
and Gerard wouldn't have time to work on, John believes he can make the
changes to the gerbers directly, and send the files out, if Gerard approves
the changes listed.

If we were to also make 10 "test stand cables" using the new "purple" cable,
we would be looking at ~$2,400.

It would cost another ~$1,350 to attach these cables to the t-board.



This would all come to a total of $6,350. We may be able to get this price down a
little bit if we got quotes from local fab houses as well, and by combining the job of
making 10 "purple cable" assemblies and assembling them to the pcb - this is
a rough number.

I believe this may be a good option - we would have the new revision of the
board with no bodge wires, we'd be using the production cable and testing
with its dielectric properties, etc., a better representation of the final
product; but it may be a tight deadline if we need it by mid-January. If you
think this is something we'd be interested in pursuing I can start requesting
quotes and see if we'd be able to have more definite numbers by the meeting
on Thursday.

Best,

Mike Capotosto

-----Original Message-----
From: Star-fst-l <star-fst-l-bounces AT lists.bnl.gov> On Behalf Of Ye,
Zhenyu
Sent: Tuesday, December 3, 2019 1:00 PM
To: star-fst-l AT lists.bnl.gov
Subject: [Star-fst-l] Weekly FST meeting - 12/5/2019 9:30am BNL time

Dear all,

We will have a weekly FST meeting this Thursday 9:30am BNL time. The
meeting agenda and bluejeans info can be found at
https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-track
er-weekly-meeting

1. T-board and inner signal cable - Jianing Dong, Mike Capotosto,
Gerard Visser Gerard is reviewing the changes to v2.1 T-board suggested by
Mike.

2. Mechanical Structure - Yi Yang, Han-sheng Li Updates on the
status of mechanical structure fabrication and assembly, cooling
soft tube compatibility test, and transportation box design

3. Module Assembly at Fermilab - Zhenyu Ye Updates on module
assembly fixture/tooling design/fabrication

4. Simulation: Te-Chuan Huang, Krishan Gopal Updates from Te-Chuan
on FST geometry modeling

If there is anything else to report/discuss, please let me know.

Best
Zhenyu
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l

_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l




Archive powered by MHonArc 2.6.24.

Top of Page